verification-before-completion — Claude Code skill
This skill blocks completion claims until the agent runs a fresh check and reads the result. Use it before commits or PRs when an agent report is not enough.
/plugin marketplace add obra/superpowers
/plugin install superpowers@superpowers-devWhat verification-before-completion does
This skill adds a check before an agent says work is complete or a bug is fixed. Use it before commits and PRs, especially after delegated work or before moving to another task.
The agent identifies the command that proves the claim, runs the full command again, and reads its complete output and exit code. If the result does not support the claim, it reports the actual state with evidence.
Tests need output showing 0 failures, while a clean linter does not prove a build. Delegated work calls for checking the VCS diff, and requirements get a line-by-line check. Install it if your agent tends to infer success from changed code or an old run.
What it helps with
- confirm passing tests with a fresh run
- check a build through its exit code
- compare an agent report with the VCS diff
- review requirements line by line before a PR
Example prompts for the agent
- Before committing, run the full test command and report the result only from fresh output.
- The subagent says the task is complete. Check the VCS diff and verify the actual state.
- Before opening a PR, check the requirements line by line and run the build command.
How to install verification-before-completion
1Plugin marketplace
/plugin marketplace add obra/superpowers/plugin install superpowers@superpowers-devThis installs the whole superpowers plugin with all its skills
2Skills CLI (Vercel)
npx skills add obra/superpowers --skill verification-before-completion -a claude-code3Manually: put the files in place
~/.claude/skills/verification-before-completion/SKILL.mdCopy the whole skill folder; for one project use .claude/skills/verification-before-completion/
1Skills CLI (Vercel)
npx skills add obra/superpowers --skill verification-before-completion -a codex2Manually: put the files in place
.agents/skills/verification-before-completion/SKILL.mdFor all projects use ~/.agents/skills/
Manually: put the files in place
.cursor/skills/verification-before-completion/SKILL.mdCursor also reads .agents/skills/ and .claude/skills/
1GitHub CLI
gh skill install obra/superpowers verification-before-completion2Manually: put the files in place
.github/skills/verification-before-completion/SKILL.mdPlatform CLI
gemini skills install https://github.com/obra/superpowers --path skills/verification-before-completionManually: put the files in place
.devin/skills/verification-before-completion/SKILL.mdThe legacy .windsurf/skills/ path still works
Claude.ai
Zip the folder and upload it in Settings → Capabilities → Skills
From the same set16
The whole set →Similar
Questions about verification-before-completion
How do I install verification-before-completion in Claude Code?
Run npx skills add obra/superpowers --skill verification-before-completion -a claude-code in Claude Code.
What does verification-before-completion do?
It requires a fresh verification command and its output before the agent claims success. The rule covers tests, builds, fixes, and task completion.
Why does a passing linter not prove that a build succeeds?
A linter is not a compiler. A build claim needs output from the build command with exit 0.
Source text
SKILL.md · MIT
---
name: verification-before-completion
description: Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always
---
# Verification Before Completion
## Overview
**Core principle:** Evidence before claims, always.
**Violating the letter of this rule is violating the spirit of this rule.**
## The Iron Law
```
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
```
If you haven't run the verification command in this message, you cannot claim it passes.
## The Gate Function
```
BEFORE claiming any status or expressing satisfaction:
1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
- If NO: State actual status with evidence
- If YES: State claim WITH evidence
5. ONLY THEN: Make the claim
Skip any step = lying, not verifying
```
## Common Failures
| Claim | Requires | Not Sufficient |
|-------|----------|----------------|
| Tests pass | Test command output: 0 failures | Previous run, "should pass" |
| Linter clean | Linter output: 0 errors | Partial check, extrapolation |
| Build succeeds | Build command: exit 0 | Linter passing, logs look good |
| Bug fixed | Test original symptom: passes | Code changed, assumed fixed |
| Regression test works | Red-green cycle verified | Test passes once |
| Agent completed | VCS diff shows changes | Agent reports "success" |
| Requirements met | Line-by-line checklist | Tests passing |
## Red Flags - STOP
- Using "should", "probably", "seems to"
- Expressing satisfaction before verification ("Great!", "Perfect!", "Done!", etc.)
- About to commit/push/PR without verification
- Trusting agent success reports
- Relying on partial verification
- Thinking "just this once"
- Tired and wanting work over
- **ANY wording implying success without having run verification**
## Rationalization Prevention
| Excuse | Reality |
|--------|---------|
| "Should work now" | RUN the verification |
| "I'm confident" | Confidence ≠ evidence |
| "Just this once" | No exceptions |
| "Linter passed" | Linter ≠ compiler |
| "Agent said success" | Verify independently |
| "I'm tired" | Exhaustion ≠ excuse |
| "Partial check is enough" | Partial proves nothing |
| "Different words so rule doesn't apply" | Spirit over letter |
## Key Patterns
**Tests:**
```
✅ [Run test command] [See: 34/34 pass] "All tests pass"
❌ "Should pass now" / "Looks correct"
```
**Regression tests (TDD Red-Green):**
```
✅ Write → Run (pass) → Revert fix → Run (MUST FAIL) → Restore → Run (pass)
❌ "I've written a regression test" (without red-green verification)
```
**Build:**
```
✅ [Run build] [See: exit 0] "Build passes"
❌ "Linter passed" (linter doesn't check compilation)
```
**Requirements:**
```
✅ Re-read plan → Create checklist → Verify each → Report gaps or completion
❌ "Tests pass, phase complete"
```
**Agent delegation:**
```
✅ Agent reports success → Check VCS diff → Verify changes → Report actual state
❌ Trust agent report
```
## When To Apply
**ALWAYS before:**
- ANY variation of success/completion claims
- ANY expression of satisfaction
- ANY positive statement about work state
- Committing, PR creation, task completion
- Moving to next task
- Delegating to agents
**Rule applies to:**
- Exact phrases
- Paraphrases and synonyms
- Implications of success
- ANY communication suggesting completion/correctness
© Jesse Vincent · MIT · obra/superpowers