tool-foundation-sprint-readiness — Claude Code skill: sprint

A pre-sprint diagnostic that decides whether to run a Foundation Sprint now, postpone it, or close gaps first. Takes 30–45 minutes.

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-readiness -a claude-code
Open on GitHub

What tool-foundation-sprint-readiness does

The skill runs eight readiness checks against a team and returns one of three verdicts: Go, Conditional Go or Wait. Each verdict comes with a diagnosis of what is in place, what is missing and what is uncertain, plus a recommended attendee list and pre-sprint activities.

Inputs are an initiative description, a team composition draft, the Decider's name and availability, and a self-assessed level of customer or market knowledge on a 1–10 scale. Below 5 means deep discovery comes first, so the verdict is Wait. A score of 5–7 gives Conditional Go with research prep. From 8 it is Go. The skill also checks that the Decider can attend both days; partial availability is already a risk.

The rules are strict. Three or more failed criteria, or a hard fail on any of the first four, produce Wait. A team with no available Decider is not ready, and appointing a stand-in without real authority does not fix that. If the decision is small, a full Foundation Sprint is overkill and a lighter prioritisation tool fits better.

What it helps with

  • decide whether to run a Foundation Sprint right now
  • get a Go / Conditional Go / Wait verdict before spending two days
  • list the gaps to close before the sprint starts
  • work out who belongs in the room and in what role
  • confirm the Decider can attend both days

Example prompts for the agent

  • Check our team's readiness for a Foundation Sprint using this initiative description
  • Should we run a Foundation Sprint now or close gaps first?
  • Produce the verdict and attendee list for our Foundation Sprint

How to install tool-foundation-sprint-readiness

1Skills CLI (Vercel)

npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-readiness -a claude-code

2Manually: put the files in place

~/.claude/skills/tool-foundation-sprint-readiness/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/tool-foundation-sprint-readiness/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about tool-foundation-sprint-readiness

How do I install tool-foundation-sprint-readiness in Claude?

Run npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-readiness -a claude-code. The skill lands in ~/.claude/skills/tool-foundation-sprint-readiness/SKILL.md.

What does tool-foundation-sprint-readiness do?

It runs eight readiness checks and returns a Go, Conditional Go or Wait verdict with a diagnosis, an attendee list and pre-sprint activities.

What do I need before running the skill?

An initiative description, a team composition draft, the Decider's name and availability, and a self-assessed level of customer or market knowledge. With no available Decider the verdict is Wait.

Source text

SKILL.md · Apache-2.0
---
name: tool-foundation-sprint-readiness
description: Pre-sprint diagnostic that determines whether a team should run a Foundation Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommended preconditions, attendee list, and pre-sprint activities. Use when a team is considering starting a Foundation Sprint and wants a fast yes/no diagnosis before committing two days of facilitated work.
license: Apache-2.0
metadata:
  classification: tool
  version: "1.0.0"
  updated: 2026-07-04
  tool: foundation-sprint
  move: readiness
  category: coordination
  frameworks:
    - foundation-sprint
    - click
    - character-note-and-vote
  timebox_minutes: 45
  roles:
    - facilitator
    - pm
    - decider
  prerequisites: []
  inputs:
    - initiative description
    - team composition draft
    - decider name and availability
    - existing customer or market knowledge level
  outputs:
    - readiness verdict
    - diagnosis
    - recommended preconditions
    - recommended attendee list
    - pre-sprint activities
  author: product-on-purpose
---

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

# Foundation Sprint Readiness

Assess whether a Foundation Sprint fits the team's current situation. Most sprints that fail were sprints that should not have been run. A 30-45 minute readiness diagnostic catches that failure mode before two days of facilitated work are spent.

Family contract: [`docs/reference/skill-families/foundation-sprint-skills-contract.md`](../../docs/reference/skill-families/foundation-sprint-skills-contract.md). This skill is a member of `foundation-sprint-skills` and conforms to the family frontmatter and Decider Checkpoint requirements.

## When to Use

- A team is considering starting a Foundation Sprint and needs a fast diagnosis before committing two days.
- A founder or PM has a "should we run a Foundation Sprint?" question and wants structured input rather than a vibes check.
- An existing sprint commitment is on the calendar and the team wants to validate that prerequisites are in place.
- Re-running a Foundation Sprint after invalidated assumptions: use to confirm new context is ready.

## When NOT to Use

- The team has already decided to run the sprint and just needs the brief. Use `tool-foundation-sprint-brief` instead.
- The team needs deep customer discovery: run customer research or problem framing first; the Foundation Sprint depends on existing customer knowledge.
- The decision is small and a full Foundation Sprint is overkill. Use a lighter prioritization or decision tool.
- No Decider is available and one cannot be appointed. Foundation Sprint requires fast strategic calls; without authority it produces options without commitment.

## What This Skill Produces

A single bundled artifact with five sections:

1. **Readiness verdict**: Go / Conditional Go / Wait
2. **Diagnosis**: what is in place, what is missing, what is uncertain
3. **Recommended preconditions** (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint
4. **Recommended attendee list** (when verdict is Go or Conditional Go): the 3-5 people who should be in the room, with role expectations
5. **Pre-sprint activities** (when verdict is Go): the prep work to complete in the days before Day 1

See `references/TEMPLATE.md` for the canonical structure and `references/EXAMPLE.md` for a worked example using the Brainshelf book-catalog thread.

## Inference Inputs

The skill runs an inference pass over these inputs to produce the verdict:

| Input | What the skill does with it |
|---|---|
| Initiative description | Determines whether a Foundation Sprint is the right tool (vs problem framing, customer research, or a Design Sprint) |
| Team composition draft | Checks roster against the Foundation Sprint role requirements; flags missing roles |
| Decider name and availability | Confirms Decider can attend both days; flags partial availability as Conditional Go risk |
| Existing customer/market knowledge level (self-assessed 1-10) | Below 5 indicates deep discovery is needed first; 5-7 indicates Conditional Go with research prep; 8+ indicates Go |
| (Optional) Existing competitor and alternative knowledge | Flags gaps that can be closed by overnight prep |
| (Optional) Logistics constraints | Confirms two days can actually be cleared |

If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before the sprint.

## Readiness Criteria (8 Canonical Checks)

The skill evaluates the team against these eight criteria, drawn from Knapp/Zeratsky (Click) and Character Capital's Foundation Sprint guide:

1. **Initiative is named and concrete.** The team can name the project, product area, or strategic question.
2. **The stakes are meaningful.** A wrong starting direction would be costly.
3. **The team has existing knowledge.** Real customer, market, competitor, or domain context to make informed choices.
4. **The Decider is available.** Strategic calls can be made during the sprint.
5. **The team is small enough.** No more than five core decision participants is preferred.
6. **Inputs are collected.** Existing research, customer examples, competitor notes, metrics are ready.
7. **The output has a path to testing.** The team can use a Design Sprint, experiment, customer research, or another validation method afterward.
8. **The organization tolerates explicit tradeoffs.** Foundation Sprint forces choosing a top bet and a backup, not preserving every possibility.

| Pattern | Verdict |
|---|---|
| All 8 criteria met cleanly | **Go** |
| 1-2 criteria are "yellow flags" but addressable in evening prep | **Conditional Go** with documented prep |
| 3 or more criteria fail, or any of 1-4 is a hard fail | **Wait** with recommended prerequisite work |

Treat the criteria as load-bearing, not a checklist to game. A team that papers over a real gap with "yes, technically" should get a Conditional Go with the gap surfaced.

## Common Pitfalls

- **Skipping the diagnostic because "we're going to run it anyway."** This is the most common cause of failed sprints. The diagnostic costs 45 minutes; the failed sprint costs 16 hours of team time plus opportunity cost.
- **Treating Conditional Go as Go without doing the prep.** Conditional Go means "Go after closing these gaps." If the gaps are not closed by Day 1 morning, the sprint enters the failure mode the diagnostic was meant to prevent.
- **Confusing readiness assessment with problem framing.** This skill assesses whether to run a Foundation Sprint, not whether the team has the right problem. If the problem is unclear, the verdict is Wait with "do problem framing first" as the precondition.
- **No Decider, no sprint.** A team with no Decider available is not ready, full stop. Appointing a "Decider for the day" who lacks real authority does not solve this.
- **Cargo-cult readiness.** Reading the criteria and answering yes to all eight without checking does not produce readiness. The skill's value is in the honest diagnosis.

## Canonical Sources

- Knapp, J., and Zeratsky, J. *Click: How to Make What People Want*. Foundation Sprint readiness guidance.
- Character Capital. "Foundation Sprint guide." https://www.character.vc/guide/foundation-sprint
- Design Sprint Academy. "Foundation Sprint readiness criteria for enterprise." Used for the enterprise-context adjustments to canonical readiness.

## Cross-Skill Usage

This skill is the entry point of the foundation-sprint-skills family. It has no prerequisites (the `metadata.prerequisites` field is intentionally empty).

When the verdict is Go, the natural next invocation is `tool-foundation-sprint-brief` to set up the sprint logistics. When the verdict is Wait, the team typically does prerequisite work (problem framing, customer research) before re-invoking this skill.

`tool-note-and-vote` may be invoked once during the readiness conversation if the team disagrees on whether a Foundation Sprint is the right tool. In practice, this is rare; the diagnostic is usually conclusive.

## Decider Checkpoint

This skill ends with a Decider Checkpoint in `references/TEMPLATE.md`. The Decider signs off on the verdict (Go / Conditional Go / Wait) and explicitly accepts the diagnosis. Without Decider sign-off, the verdict is advisory; with sign-off, it is the commitment that triggers (or postpones) the sprint.

© product-on-purpose · Apache-2.0 · product-on-purpose/pm-skills

Similar skills

Everything for Notes, tasks and projects →

From the same set68

tool-design-sprint-map-and-target Guides Day 1 of a Design Sprint to produce the Monday artifact: long-term goal, customer map, HMW clusters, and target moment. CX Codex +1 620installs tool-design-sprint-decide-and-storyboard Runs Wednesday of a Design Sprint: art museum layout, heat map, speed critique, straw poll, the Decider's supervote and a 5-15 step storyboard. CX Codex +1 620installs tool-design-sprint-readiness A pre-sprint diagnostic that tells a team whether to run a Design Sprint now, postpone it, or close gaps first. CX Codex +1 619installs discover-market-sizing Runs several market-sizing frameworks at once and folds the results into one range with confidence labels. Useful before an investment case or a go/no-go call. CX Codex +1 619installs tool-design-sprint-brief Builds a two-page brief before a Design Sprint starts: challenge, questions, roles, customer recruiting, prototype medium and success criteria. CX Codex +1 617installs tool-design-sprint-sketch Runs day two of a Design Sprint: lightning demos plus the four-step independent sketch protocol. Useful for a facilitator once Monday's target is locked. CX Codex +1 616installs utility-pm-skill-auditor Runs every validator across the repo, re-derives aggregate counters and surfaces cross-cutting issues that no single validator catches. CX Codex +1 601installs utility-pm-changelog-curator Builds a CHANGELOG draft from git log between tags and applies the repo hygiene rules. Useful right before a release. CX Codex +1 597installs

Project sponsors

Companies that keep this analytics open
Gold sponsor

Impressions, clicks and code copies — open statistics. We keep the numbers public for the same reason NeBlask itself is public. Become a sponsor