Skip to main content
skill CX Codex

tool-foundation-sprint-approach-options — Claude Code skill

Facilitates the Day 2 morning step of a Foundation Sprint. Generates 3 to 7 candidate approaches as one-page summaries before the team locks into a single bet.

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-approach-options -a claude-code
Open on GitHub

What tool-foundation-sprint-approach-options does

The skill structures a 75-minute workshop session for Day 2 morning. The facilitator anchors the boundary using two strategic differentiators, followed by silent ideation and clustering. The Decider then narrows candidates down to 3 to 7 options. If the team settles on only 2 approaches, the skill forces them back to ideation to eliminate first-idea bias.

Each selected approach receives a one-page summary. It captures a clear label, a one-sentence customer explanation, a short rationale, a simple visual or doodle, and explicit alignment with both differentiators. Finally, an approach set table compares capture mechanisms, recall mechanisms, and primary trade-offs.

Running this step without Day 1 sign-off will derail the sprint. The skill strictly requires the basics and differentiation bundled artifacts; without them, candidate approaches detach from the agreed 2x2 positioning.

What it helps with

  • generate between 3 and 7 candidate strategic approaches
  • avoid anchoring on the team's first concept
  • map each approach against both chosen differentiators
  • compile a comparison table detailing capture, recall, and key trade-offs

Example prompts for the agent

  • Run the Day 2 morning Foundation Sprint session using our basics and differentiation artifacts.
  • Structure our four candidate approaches into one-page summaries with visuals and trade-offs.
  • Build the approach set summary table comparing all selected candidates.

How to install tool-foundation-sprint-approach-options

1Skills CLI (Vercel)

npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-approach-options -a claude-code

2Manually: put the files in place

~/.claude/skills/tool-foundation-sprint-approach-options/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/tool-foundation-sprint-approach-options/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about tool-foundation-sprint-approach-options

How to install tool-foundation-sprint-approach-options in Claude Code?

Run npx skills add product-on-purpose/pm-skills --skill tool-foundation-sprint-approach-options -a claude-code in your terminal. The skill file is placed in ~/.claude/skills/tool-foundation-sprint-approach-options/SKILL.md.

What does tool-foundation-sprint-approach-options do?

It guides a 75-minute sprint phase where teams generate 3 to 7 strategic approaches. Each option gets a one-page summary with a visual sketch, followed by an overview comparison table.

What prerequisites are required before using this skill?

It requires completed Day 1 outputs from tool-foundation-sprint-basics and tool-foundation-sprint-differentiation. These provide the target customer profile and the two committed differentiators.

Source text

SKILL.md · Apache-2.0
---
name: tool-foundation-sprint-approach-options
description: Day 2 morning move of a Foundation Sprint. Forces generation of 3 to 7 candidate approaches as one-page summaries before the team converges on a top bet. Use after Day 1 is signed and before Magic Lenses on Day 2 afternoon. Enforces a minimum of 3 approaches to prevent first-idea anchoring. Each approach summary names what it is, why it serves the differentiators, and includes a simple visual.
license: Apache-2.0
metadata:
  classification: tool
  version: "1.0.0"
  updated: 2026-07-04
  tool: foundation-sprint
  move: approach-options
  category: ideation
  frameworks:
    - foundation-sprint
    - click
  timebox_minutes: 75
  roles:
    - facilitator
    - decider
    - pm
    - design
    - engineering
  prerequisites:
    - tool-foundation-sprint-basics
    - tool-foundation-sprint-differentiation
  inputs:
    - basics bundled artifact
    - differentiation bundled artifact
    - approach candidates
  outputs:
    - 3 to 7 one-page approach summaries
    - approach set summary table
  author: product-on-purpose
---

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

# Foundation Sprint Approach Options

Day 2 morning of a Foundation Sprint. The team forces itself to generate multiple plausible approaches before committing to one. The skill enforces a minimum of 3 approaches; anchoring on a single approach is the most common Day 2 failure mode.

Family contract: [`docs/reference/skill-families/foundation-sprint-skills-contract.md`](../../docs/reference/skill-families/foundation-sprint-skills-contract.md). This skill is a member of `foundation-sprint-skills`.

## When to Use

- Day 2 morning of a Foundation Sprint.
- Day 1 is signed; the Mini Manifesto, decision principles, and differentiation chart are committed.
- The team is ready to generate candidate approaches before evaluating them through Magic Lenses in the afternoon.

## When NOT to Use

- Day 1 is unresolved. Approach Options without differentiation context produces approaches that miss the strategic position.
- The team has only one approach in mind and is unwilling to generate alternatives. The skill forces minimum 3; if the team refuses, the issue is sprint discipline, not tooling.
- More than 7 approaches are emerging organically. The skill caps generation at 7; beyond that the team is generating features, not strategic approaches.

## What This Skill Produces

A single bundled artifact containing:

1. **3 to 7 one-page approach summaries**, each with:
   - Name and label (color, letter, ID)
   - One-sentence "what it is"
   - "Why it's a good idea" rationale (1 short paragraph)
   - Simple doodle or textual visual description
   - How the approach serves the two chosen differentiators
2. **Approach set summary table** comparing all approaches at a glance (label, name, capture mechanism, recall mechanism, primary trade-off).

See `references/TEMPLATE.md` for the canonical structure and `references/EXAMPLE.md` for the Brainshelf example.

## Sequence (75 minutes)

### Step 1: Frame the approach space (5 min)

The facilitator restates the differentiation: "We are committing to [differentiator 1] and [differentiator 2]. Approaches that fail either of these are out of scope." This sets the boundary; the team generates inside it, not outside it.

### Step 2: Silent ideation (15-20 min)

Each team member generates 2-4 candidate approaches silently. Cluster duplicates. Surface 8-12 candidates.

### Step 3: Cluster and select 3-7 (15-25 min via Decider call)

The team clusters similar approaches and the Decider narrows to 3-7 candidates that will be one-page-summarized. The 3-minimum is enforced; if the team produces 2 candidates after clustering, push the team back to ideation to generate at least one more.

### Step 4: One-page summarize each approach (25-40 min)

Each team member takes 1-2 approaches and writes the one-page summary. Each summary names:

- **Label**: a color, letter, or short identifier (Yellow, Blue, Approach A, etc.)
- **What it is**: one sentence the customer would understand
- **Why it's a good idea**: short paragraph naming the customer value and the team's ability to deliver
- **Visual**: a simple doodle or textual description of what the customer sees or does
- **How it serves the differentiators**: one or two lines per chosen differentiator

### Step 5: Cross-summary review (5-10 min)

The team reviews the full set, flagging summaries that don't fit the differentiators or that overlap so heavily with another approach that they're duplicates. The Decider approves the set advancing to Magic Lenses.

## Approach Generation Discipline

The skill enforces five rules at decision-point:

1. **Minimum 3, maximum 7.** Fewer than 3 means the team is anchored on one idea; more than 7 means the team is generating features.
2. **Each approach must be a strategic path, not a feature.** "Add a settings screen" is a feature; "make capture the home screen" is a strategic path.
3. **Each approach must serve both chosen differentiators (not just one).** An approach that wins on differentiator 1 but fails differentiator 2 should be either revised or dropped.
4. **Each approach must be visually describable.** If the team can't draw it on a card, the approach is too abstract for the sprint.
5. **No first-idea bias.** The first approach the team thought of should be included only if it survives the differentiation check; many teams find their initial idea is not the strongest after generating alternatives.

## Inference Inputs

| Input | What the skill does with it |
|---|---|
| Basics bundled artifact | Reads target customer to ensure approaches are designed for them, not for an adjacent customer |
| Differentiation bundled artifact | Reads the 2 chosen differentiators and the 2x2 position; flags approaches that miss either differentiator |
| Approach candidates (optional) | If pre-supplied, pre-populates the silent ideation board; team adds and refines rather than starting cold |

## Common Pitfalls

- **Generating features instead of approaches.** "Add notifications" is not an approach; it's a feature. The skill enforces strategic-path framing.
- **Too few options.** Stopping at 2 approaches because "those are obviously the choices" anchors the team. Force a third even if it's intentionally weaker; it surfaces the trade-offs.
- **Approaches that fail one differentiator.** An approach that beats differentiator 1 but loses differentiator 2 has rejected the Day 1 strategic commitment. Either drop it or revise it.
- **Skipping the visual.** "I can describe it in prose" defeats the purpose. The visual forces concreteness.
- **Overlap masquerading as distinct approaches.** Two summaries that differ only in implementation detail are one approach. Cluster them.

## Decider Role

The Decider's job during Approach Options:

1. Restate the differentiation boundary at the start.
2. Narrow the clustered candidates to 3-7 for one-page summary.
3. Approve the final set advancing to Magic Lenses; reject summaries that drift from the differentiation.

The Decider does NOT pick a top approach in this skill. Magic Lenses produces the top bet; Approach Options produces the candidates Magic Lenses will evaluate.

## Canonical Sources

- Character Capital. "Foundation Sprint guide." Approach generation agenda.
- Knapp, J., and Zeratsky, J. *Click*. Day 2 morning sequence.

## Cross-Skill Usage

Prerequisites: `tool-foundation-sprint-differentiation`. The Day 1 strategic position is the load-bearing input.

Next invocation: `tool-foundation-sprint-magic-lenses` in the afternoon. The approach set produced here is the input to Magic Lenses scoring.

## Decider Checkpoint

This skill ends with a Decider Checkpoint in `references/TEMPLATE.md`. The Decider signs off on the set of approaches advancing to Magic Lenses, confirming none are out-of-scope and none are duplicates. Without sign-off, Magic Lenses begins with an unstable candidate set.

© product-on-purpose · Apache-2.0 · product-on-purpose/pm-skills

Similar skills

All skills for Notes, tasks and projects →

From the same set68

measure-survey-analysis Turns survey results into PM-ready findings: persona segments, themes in open-text answers, hypothesis status, and explicit warnings about what the data cannot support. CX Codex +1 634installs utility-pm-critic Runs adversarial review on a PM artifact through the pm-critic sub-agent. Findings come graded P0/P1/P2/P3 with a concrete fix for each one. CX Codex +1 631installs tool-note-and-vote Runs a structured 25-minute group decision session using silent ideation and a final Decider supervote. Prevents groupthink and status bias in teams of 3 to 10 people. CX Codex +1 628installs tool-foundation-sprint-magic-lenses A skill for day 2 of a Foundation Sprint: it runs candidate approaches through several lenses, surfaces contradictions, and names a top bet with a backup plan. CX Codex +1 622installs tool-foundation-sprint-brief Builds a one-page brief before a Foundation Sprint: scope, the decision to unlock, roles, logistics and what to bring. CX Codex +1 622installs tool-foundation-sprint-founding-hypothesis Turns the end of a Foundation Sprint into one canonical sentence plus an assumption scorecard. Use it on Day 2 once Magic Lenses is signed. CX Codex +1 622installs tool-foundation-sprint-basics Structures the Day 1 morning move of a Foundation Sprint. Helps teams align on target customer, core problem, team advantage, and competitor alternatives. CX Codex +1 621installs tool-foundation-sprint-differentiation A skill for the afternoon of Foundation Sprint Day 1: turns the morning Basics frame into a defensible position and a one-page Mini Manifesto. CX Codex +1 621installs

Project sponsors

Companies that keep this analytics open
Gold sponsor

Impressions, clicks and code copies — open statistics. We keep the numbers public for the same reason NeBlask itself is public. Become a sponsor