scope-check — Claude Code skill for scope review

Compares planned work with the project’s current state, measures scope changes, and suggests cuts. Run it before wrapping up a sprint or milestone.

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add Donchitos/Claude-Code-Game-Studios --skill scope-check -a claude-code
Open on GitHub

What scope-check does

The skill locates a plan for a feature, sprint, or milestone, then checks project files, git log, the active sprint plan, and TODO or FIXME comments. Its report lists added and dropped items, assesses risks, and recommends what to cut, defer, or keep. It does not edit files.

A verdict—PASS, CONCERNS, NOT ASSESSED, or FAIL—is based on the net percentage change in scope. If the plan cannot be found, the check stops. An empty baseline or an unclear current state produces NOT ASSESSED, not a percentage. There is no comparison without a usable baseline.

What it helps with

  • compare current work against its original plan
  • spot tasks added during a sprint
  • measure the net change in planned work
  • identify dropped items and their impact
  • decide which additions to cut or defer

Example prompts for the agent

  • Check whether the inventory feature has grown beyond its original plan.
  • Compare the current work with sprint-3 and list added tasks.
  • Review scope changes for the vertical-slice milestone and suggest cuts.

How to install scope-check

1Skills CLI (Vercel)

npx skills add Donchitos/Claude-Code-Game-Studios --skill scope-check -a claude-code

2Manually: put the files in place

~/.claude/skills/scope-check/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/scope-check/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about scope-check

How do I install scope-check in Claude Code?

Run npx skills add Donchitos/Claude-Code-Game-Studios --skill scope-check -a claude-code. The skill file is at ~/.claude/skills/scope-check/SKILL.md.

What does scope-check do?

It compares the original plan with the project’s current state, lists additions and removals, assesses risks, and assigns a verdict based on net scope change.

What if the baseline is empty or the current work cannot be found?

The skill returns NOT ASSESSED instead of calculating a percentage. If it cannot locate the baseline document, it stops.

Source text

SKILL.md · MIT
---
name: scope-check
description: "Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'"
argument-hint: "[feature-name or sprint-N]"
user-invocable: true
allowed-tools: Read, Glob, Grep, Bash(git log *)
model: haiku
---

# Scope Check

This skill is read-only — it reports findings but writes no files.

Compares original planned scope against current state to detect, quantify, and triage
scope creep.

**Argument:** `$ARGUMENTS` — the whole string: a feature name (it may be several words), sprint number, or milestone name.

---

## Phase 1: Find the Original Plan

Locate the baseline scope document for the given argument:

- **Feature name** → read `design/gdd/[feature].md` or matching file in `design/`
- **Sprint number** (e.g., `sprint-3`) → read `production/sprints/sprint-003.md` (the name `/sprint-plan` writes) or similar
- **Milestone** → read `production/milestones/[name].md`

If the document is not found, report the missing file and stop. Do not proceed without
a baseline to compare against. Read a GDD by section: find the headings you need with
the Grep tool (pattern `^#`, content mode) and Read those ranges with offset and
limit.

---

## Phase 2: Read the Current State

Check what has actually been implemented or is in progress:

- Scan the codebase for files related to the feature/sprint
- Read git log for commits related to this work (`git log --oneline --since=[start-date]`)
- Check for TODO/FIXME comments that indicate unfinished scope additions
- Check active sprint plan if the feature is mid-sprint

---

## Phase 3: Compare Original vs Current Scope

Produce the comparison report:

```markdown
## Scope Check: [Feature/Sprint Name]
Generated: [Date]

### Original Scope
[List of items from the original plan]

### Current Scope
[List of items currently implemented or in progress]

> **If Phase 4 will return NOT ASSESSED, do not render the numeric block below.**
> Replace the counts and the Bloat Score with
> `[Baseline | Current state] unusable — see verdict` (whichever side could not
> be read) and give the reason. A rendered
> `Original items: 0 / Net scope change: 0%` one section above a NOT ASSESSED
> verdict re-creates the exact "0% reads as on track" hazard Phase 4 exists to
> kill, one phase earlier — and readers trust a number over a caveat.

### Scope Additions (not in original plan)
| Addition | Source | When | Justified? | Effort |
|----------|--------|------|------------|--------|
| [item] | [commit/person] | [date] | [Yes/No/Unclear] | [S/M/L] |

### Scope Removals (in original but dropped)
| Removed Item | Reason | Impact |
|-------------|--------|--------|
| [item] | [why removed] | [what's affected] |

### Bloat Score
- Original items: [N]
- Current items: [N]
- Items added: [N] (+[X]%)
- Items removed: [N]
- Net scope change: [+/-N] ([X]%)

### Risk Assessment
- **Schedule Risk**: [Low/Medium/High] — [explanation]
- **Quality Risk**: [Low/Medium/High] — [explanation]
- **Integration Risk**: [Low/Medium/High] — [explanation]

### Recommendations
1. **Cut**: [Items that should be removed to stay on schedule]
2. **Defer**: [Items that can move to a future sprint/version]
3. **Keep**: [Additions that are genuinely necessary]
4. **Flag**: [Items that need a decision from producer/creative-director]
```

---

## Phase 4: Verdict

Assign a canonical verdict based on net scope change:

| Net Change | Verdict | Meaning |
|-----------|---------|---------|
| ≤10% | **PASS** | On Track — within acceptable variance |
| >10–25% | **CONCERNS** | Minor Creep — manageable with targeted cuts |
| >25–50% | **FAIL** | Significant Creep — must cut or formally extend timeline |
| >50% | **FAIL** | Out of Control — stop, re-plan, escalate to producer |

**Before applying that table, check that the percentage means something.** Emit
**NOT ASSESSED** instead — never a computed percentage — when any of:

- The **baseline document exists but enumerates no scope items** (all headings,
  placeholders, or `[TO BE CONFIGURED]`). Phase 1 stops when the file is *absent*;
  this is the case where it is present and empty, and it is the more dangerous
  one, because zero items yields a 0% net change that renders as **PASS — On
  Track**. Nothing was compared. Nothing was on track.
- The **current state cannot be determined** — no related source files, no commits
  in the window, nothing in progress to read. Comparing a real baseline against an
  unreadable present is not a 0% change, and not the −100% that zero current
  items computes — the table reads both as PASS.
- The denominator would be zero for any other reason. A percentage computed from
  no baseline items is not a small number; it is not a number.

`NOT ASSESSED` **outranks PASS** (a comparison that never happened has not shown
scope is on track) and **ranks below CONCERNS and FAIL** (measured creep is more
actionable than an unmeasurable baseline).

Output the verdict prominently:

```
**Scope Verdict: [PASS / CONCERNS / NOT ASSESSED / FAIL]**
Net change: [+X%] — [On Track / Minor Creep / Significant Creep / Out of Control]
           [or: NOT ASSESSED — [which side could not be read, and why]]
```

---

## Phase 5: Next Steps

After presenting the report, offer concrete follow-up:

- **PASS** → no action required. Suggest re-running before next milestone.
- **NOT ASSESSED** → say which side was unreadable and what would fix it (populate
  the baseline document, or point the skill at where the work actually lives).
  Do not offer a re-run against the same inputs — it will produce the same
  non-answer.
- **CONCERNS** → offer to identify the 2–3 additions with best cut ratio. Reference `/sprint-plan update` to formally re-scope (if the project has no sprint plan, as on the default minimal workflow, re-scope by editing the brief's build order).
- **FAIL** → recommend escalating to producer. Reference `/sprint-plan update` for re-planning (if the project has no sprint plan, as on the default minimal workflow, edit the brief's build order) or `/estimate` to re-baseline timeline.

End every verdict except NOT ASSESSED with:
> "Run `/scope-check [name]` again after cuts are made to verify the verdict improves."

(NOT ASSESSED ends with what would make it assessable, above — a re-run against
the same inputs would repeat the non-answer.)

---

### Rules

- Scope creep is additions without corresponding cuts or timeline extensions
- Not all additions are bad — some are discovered requirements. But they must be acknowledged and accounted for
- When recommending cuts, prioritize preserving the core player experience over nice-to-haves
- Always quantify scope changes — "it feels bigger" is not actionable, "+35% items" is

© Donchitos · MIT · Donchitos/Claude-Code-Game-Studios

Similar skills

SKILL.md skills catalog →

From the same set72

Project sponsors

Companies that keep this analytics open
Gold sponsor

Impressions, clicks and code copies — open statistics. We keep the numbers public for the same reason NeBlask itself is public. Become a sponsor