project-risk-register — Claude Code skill

project-risk-register — a skill for identifying, assessing, and prioritizing project risks using probability-impact scoring. Assigns owners and mitigation plans, then tracks risk evolution throughout the project lifecycle.

no license 108 installs ★ 203 updated 2026-09-01

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add lyndonkl/claude --skill project-risk-register -a claude-code
Open on GitHub

What project-risk-register does

The skill structures risk analysis through a 5×5 matrix: each risk receives a probability score (1–5) and impact score (1–5), multiplied together and plotted on a grid. Critical risks (≥20) require immediate action and weekly review; high risks (12–19) demand active management; medium risks (6–11) need close monitoring with monthly updates; low risks (1–5) can be accepted or minimally addressed.

For significant risks, a named owner is assigned, along with a mitigation plan (how to reduce probability beforehand), a contingency plan (what to do if the risk occurs), and triggers (when to activate the contingency). The skill suggests brainstorming categories: technical failures, schedule delays, resource gaps, external factors, and scope creep. Each risk type maps to response strategies—mitigate the probability, prepare a backup, transfer the risk, or accept it.

The register is reviewed weekly on active projects or monthly on longer ones. Probabilities and impacts shift as the project context changes. Watch for increasing scores over time—a red flag that mitigation is failing or new problems are emerging faster than they're resolved.

What it helps with

  • build a risk register and visualize risks on a probability-impact matrix
  • assess and score each risk for prioritization
  • identify which risks require immediate escalation
  • assign owners, mitigation strategies, and contingency plans
  • monitor and update risk status throughout the project

Example prompts for the agent

  • What risks could derail our data migration project?
  • Help me build a risk register for this product launch
  • Plot these risks on a probability-impact matrix and flag the critical ones

How to install project-risk-register

1Skills CLI (Vercel)

npx skills add lyndonkl/claude --skill project-risk-register -a claude-code

2Manually: put the files in place

~/.claude/skills/project-risk-register/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/project-risk-register/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about project-risk-register

How do I install project-risk-register in Claude Code?

Run npx skills add lyndonkl/claude --skill project-risk-register -a claude-code, then open ~/.claude/skills/project-risk-register/SKILL.md.

What does project-risk-register do?

It guides you through identifying and scoring project risks on a probability-impact matrix, assigning owners and mitigation plans for each risk, and updating the register as the project evolves.

What risk categories does the skill cover?

Technical (API changes, vulnerabilities), schedule (estimation errors, delays), resource (key person departures), external (regulatory shifts), and organizational (competing priorities, budget cuts).

Similar skills

All skills for Notes, tasks and projects →

From the same set49

The whole set →
reviews-retros-reflection reviews-retros-reflection structures retrospectives, incident post-mortems, and periodic check-ins. Helps teams identify root causes and turn feedback into SMART action items without blame. CX Codex +1 113installs causal-inference-root-cause causal-inference-root-cause — a skill that pushes an agent through a five-step causal investigation, so the answer to why something happened comes with a mechanism and a tested alternative. CX Codex +1 110installs security-threat-model security-threat-model guides threat modeling across system components using STRIDE methodology, trust boundary maps, and defense-in-depth principles before audits or releases. CX Codex +1 109installs discovery-interviews-surveys discovery-interviews-surveys is a Claude Code skill for planning user interviews and surveys to test product assumptions and uncover customer problems, before building or when exploring why people switch products. CX Codex +1 109installs forecast-premortem forecast-premortem is a Claude Code skill that stress-tests probabilistic forecasts by assuming failure before launch. It reveals overlooked risks and recalibrates overconfident estimates. CX Codex +1 108installs mapping-visualization-scaffolds The mapping-visualization-scaffolds skill turns dependencies, hierarchies, and workflows into structured visual maps. Use it for architecture notes, concept mapping, and relationship analysis. CX Codex +1 108installs reference-class-forecasting reference-class-forecasting grounds predictions in historical track records by finding similar past events and establishing baseline probabilities before judging specific cases. CX Codex +1 105installs scientific-email-polishing scientific-email-polishing assists researchers in drafting academic emails, editor cover letters, and rebuttals to peer reviewers. Keeps the tone professional while structuring explicit requests. CX Codex +1 105installs

Project sponsors

Companies that keep this analytics open