launch-runbook — Claude Code skill: go-live execution
The launch-runbook skill structures a product or website launch: pre-go-live checks, deployment sequencing, DNS cutover steps, post-launch verification, and rollback triggers.
MIT 325 installs ★ 1,107 updated 2026-11-16
npx skills add rampstackco/claude-skills --skill launch-runbook -a claude-codeWhat launch-runbook does
The skill breaks down launch into four phases with explicit steps, ownership, and verification gates. Phase 1 covers pre-launch readiness from T-30 days to T-1 hour. Phase 2 sequences the cutover itself: deploy code, verify, handle DNS if needed, disable maintenance mode, run smoke tests. Phase 3 confirms health in the first 24 hours: check critical flows, monitor error rates, verify Core Web Vitals and analytics. Phase 4 tracks the long tail through day seven.
Each phase assigns roles—launch lead, deploy operator, QA lead, comms lead, on-call engineer, stakeholder rep—and clarifies responsibilities. Rollback criteria are defined upfront (error rate threshold, broken user flow, database issue, security finding). Communication plan specifies channels, update frequency during each phase, and escalation paths. The workflow moves from building the runbook 30 days out through tabletop rehearsal to day-of execution and post-launch monitoring.
What it helps with
- structure a launch with clear phases, roles, and verification gates
- coordinate go-live across multiple teams with an explicit runbook
- define and test a rollback procedure before deployment day
- plan DNS cutover sequencing and verify propagation
- set rollback criteria and assign decision authority in advance
Example prompts for the agent
- Build me a launch runbook for our site redesign with DNS cutover on September 15
- Create a go-live checklist: four teams, explicit roles, rollback triggers, comms plan
- Design a deployment procedure covering pre-launch verification, cutover steps, and first-week monitoring
How to install launch-runbook
1Skills CLI (Vercel)
npx skills add rampstackco/claude-skills --skill launch-runbook -a claude-code2Manually: put the files in place
~/.claude/skills/launch-runbook/SKILL.mdCopy the whole skill folder; for one project use .claude/skills/launch-runbook/
1Skills CLI (Vercel)
npx skills add rampstackco/claude-skills --skill launch-runbook -a codex2Manually: put the files in place
.agents/skills/launch-runbook/SKILL.mdFor all projects use ~/.agents/skills/
1Skills CLI (Vercel)
npx skills add rampstackco/claude-skills --skill launch-runbook -a cursor2Manually: put the files in place
.cursor/skills/launch-runbook/SKILL.mdCursor also reads .agents/skills/ and .claude/skills/
1GitHub CLI
gh skill install rampstackco/claude-skills skills/launch-runbook2Manually: put the files in place
.github/skills/launch-runbook/SKILL.md1Skills CLI (Vercel)
npx skills add rampstackco/claude-skills --skill launch-runbook -a gemini-cli2Platform CLI
gemini skills install https://github.com/rampstackco/claude-skills --path skills/launch-runbookManually: put the files in place
.devin/skills/launch-runbook/SKILL.mdThe legacy .windsurf/skills/ path still works
Skills CLI (Vercel)
npx skills add rampstackco/claude-skills --skill launch-runbook -a opencodeClaude.ai
Zip the folder and upload it in Settings → Capabilities → Skills
Step by step, with commands for each platform: How to install skills in Claude Code: five ways
Questions about launch-runbook
How do I install launch-runbook in Claude Code?
Run npx skills add rampstackco/claude-skills --skill launch-runbook -a claude-code, then view it at ~/.claude/skills/launch-runbook/SKILL.md.
What does launch-runbook do?
It organizes a launch into four phases: pre-launch prep, cutover execution, verification (first 24 hours), and stabilization (first week). Assigns roles, defines verification at each step, sets rollback criteria, and outlines communication timing.
When should I not use this skill?
Use qa-testing for pre-launch testing, incident-response if something breaks post-launch, and after-action-report for retrospectives after launch.
Source text
SKILL.md · MIT
--- name: launch-runbook description: "Plan and execute a launch runbook covering pre-launch verification, go-live procedures, DNS cutover, post-launch monitoring, and rollback procedures. Use this skill whenever the user is preparing to launch a website or product, planning a DNS cutover, building a go-live checklist, or executing a launch day. Triggers on launch runbook, go-live, launch day, DNS cutover, deploy to production, site launch, product launch, cutover plan, launch checklist, deployment procedure. Also triggers when a launch is approaching and the team needs structured coordination, even if 'runbook' is not explicitly stated." category: operations catalog_summary: "Go-live runbook, DNS cutover, deploy day procedures" display_order: 1 --- # Launch Runbook Plan and execute the launch of a website, product, or major release. The runbook is the document everyone uses on launch day. Stack-agnostic. This skill is for the launch event. For pre-launch QA, use `qa-testing`. For post-launch incident handling, use `incident-response`. --- ## When to use - Launching a new website or major redesign - Migrating from one platform to another - Releasing a major product or feature - Coordinating cross-team launches - Building a runbook for a recurring deploy ## When NOT to use - Pre-launch testing (use `qa-testing`) - Post-launch incident response (use `incident-response`) - After-launch retrospective (use `after-action-report`) - The recurring release cycle: versioning, freeze, go or no-go, staged rollout, hotfixes, release notes (use `release-management`) --- ## Required inputs - The launch scope (what's being launched) - The launch window (date, time, duration) - The team (roles, on-call rotation) - The rollback criteria (when to abort) - The communication plan (who tells whom what, when) --- ## The framework: 4 phases A launch has four phases. The runbook covers all four. ### Phase 1: Pre-launch (T-30 days to T-1 hour) Verify everything is ready before the launch window. **T-30 days:** - Final scope locked - Cross-team commitments confirmed - Pre-launch QA scheduled - Comms plan drafted **T-7 days:** - Pre-launch QA complete - All critical and major issues resolved - Performance baseline measured - Rollback procedures documented and tested - DNS TTL lowered (if DNS change is part of launch) **T-1 day:** - Final go/no-go meeting - Roles confirmed - Communication channels set up - Backup of current production state **T-1 hour:** - Team assembled in shared communication channel - Tools and access verified - Final smoke test on staging ### Phase 2: Cutover (T-0) The actual launch. Sequenced steps with owners and verifications. **Standard cutover steps:** 1. Announce start to internal team 2. Enable maintenance mode (if applicable) 3. Run final database migrations (if applicable) 4. Deploy code to production 5. Verify deploy completed without errors 6. Run smoke tests on production 7. DNS cutover (if applicable) 8. Verify DNS propagation 9. Disable maintenance mode 10. Run full smoke tests on production 11. Announce launch to internal team 12. Begin monitoring window Each step has: - Owner - Pre-conditions - Action - Verification - Time estimate - Rollback procedure ### Phase 3: Verification (T+0 to T+24 hours) Confirm the launch is healthy. **Within first hour:** - Critical user flows working (checkout, signup, login) - No spike in error rates - Performance within expected ranges - Analytics tracking firing - Email and notifications working **Within first 24 hours:** - No regression in key business metrics - No accumulating error patterns - Core Web Vitals stable - Search Console showing no critical issues (if SEO-relevant) ### Phase 4: Stabilization (T+24 hours to T+7 days) Monitor the long tail. - Track error rates day over day - Track performance day over day - Track key business metrics vs baseline - Address any non-blocking issues identified - Plan the AAR (after-action report) --- ## Roles and responsibilities A launch has clear role assignments. Ambiguity here is the most common cause of launch chaos. | Role | Responsibility | |---|---| | Launch lead | Owns the runbook. Calls go/no-go. Calls rollback. | | Deploy operator | Executes the technical deploy steps. | | QA lead | Runs verification tests and confirms each milestone. | | Comms lead | Posts internal updates, manages external messaging. | | On-call engineer | Available for issues during and after launch. | | Stakeholder rep | Approves on behalf of business stakeholders. | For small teams, one person may fill multiple roles. Each role's responsibilities should still be explicit. --- ## Rollback criteria Define before the launch. Decisions are easier to make pre-emptively than under pressure. **Automatic rollback triggers:** - Error rate exceeds X percent of normal - Critical user flow (defined) is broken - Database integrity issue - Security vulnerability discovered post-deploy **Discretionary rollback triggers:** - Performance degradation beyond Y percent - Significant degradation in key business metric - Customer-facing error patterns **Decision authority:** The launch lead calls rollback. Pre-define who acts as deputy if launch lead is unavailable. --- ## Communication plan ### Internal channels - **Primary launch channel:** Real-time chat for the launch team only - **Status channel:** Broader internal updates - **War room:** Optional video call for high-stakes launches ### Update cadence during launch - Every 15 minutes during cutover - Every hour during verification phase - Daily during stabilization phase ### External communication - **Customer-facing announcement:** Pre-drafted, scheduled to publish at confirmed-success milestone - **Status page:** Updated proactively if any user impact - **Support team:** Briefed in advance on what's launching, common questions, escalation path --- ## Workflow 1. **Build the runbook 30 days out.** Scope, sequence, roles, rollback criteria, comms plan. 2. **Test the rollback procedure.** Untested rollback is hope, not procedure. 3. **Run a tabletop exercise.** Walk through the runbook with the full team. Find gaps. 4. **Lower DNS TTL** 48 to 72 hours before launch (if DNS change is part of launch). 5. **Day-of:** Run the runbook step by step. Verify each step before moving to next. 6. **Monitor.** First hour, first day, first week. Document anything noteworthy. 7. **Schedule the AAR** within 1 to 2 weeks of launch. --- ## Failure patterns - **Runbook written by one person, not reviewed.** Single perspective misses scenarios. - **No tested rollback.** Discovering rollback is broken at the moment you need it. - **Vague step descriptions.** "Deploy to production" without specifying which tool, which command, which environment. - **No verification step after each action.** Errors propagate. - **Communication gaps.** Team doesn't know launch is happening, or doesn't know it succeeded. - **Launching at end of day Friday.** Or before a holiday. Reduce the time available to respond. - **Skipping pre-launch QA** to hit a date. The bugs appear on launch day instead. - **Launch fatigue.** Long launches without breaks lead to errors. Plan rest cycles for multi-day launches. - **No on-call for first 24 hours.** Someone must be reachable. --- ## Output format Default output: a markdown runbook at `launch-runbook-[project].md` plus supporting checklists. Structure: 1. Launch metadata (what, when, who) 2. Roles and responsibilities 3. Pre-launch checklist (T-30, T-7, T-1, T-1hr) 4. Cutover sequence (numbered steps, owners, verifications) 5. Rollback procedure 6. Rollback criteria (automatic and discretionary) 7. Communication plan 8. Verification checklist (first hour, first day) 9. Stabilization plan (first week) 10. Contacts (escalation paths, on-call) --- ## Reference files - [`references/runbook-template.md`](references/runbook-template.md) - Fillable runbook template with example cutover sequences.