gantt-chart — Claude Code skill: Gantt charts for construction

Draws Gantt charts for construction projects: tasks with dependencies, progress bars, critical path. Exports to text, Mermaid and HTML.

MIT 160 installs ★ 434 updated 2026-10-19

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill gantt-chart -a claude-code
Open on GitHub

What gantt-chart does

The skill takes a schedule in DataFrame format and renders a visual chart with tasks, milestones and their relationships. Inside are Python classes for tasks (Task), four dependency types (FS, SS, FF, SF) and a generator for three formats: ASCII text chart with progress bars, Mermaid code for embedding in documents, and HTML table. Tasks are grouped by WBS codes, show status (not started, in progress, completed, delayed, on hold) and completion percentage.

Each task stores start and end dates, hierarchy level, assignee, and flags for milestones or summary tasks. The skill calculates duration, finds project boundaries and scales to fit output width. Requires python3 in PATH and the pandas library.

What it helps with

  • build a Gantt chart from a task table
  • show dependencies between construction phases
  • track progress by WBS codes
  • export schedule to Mermaid
  • visualize project critical path

Example prompts for the agent

  • Build a Gantt chart from schedule.csv with task_id, name, start_date, end_date columns
  • Show task progress in text format 80 characters wide
  • Export schedule as Mermaid code for pasting into README

How to install gantt-chart

1Skills CLI (Vercel)

npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill gantt-chart -a claude-code

2Manually: put the files in place

~/.claude/skills/gantt-chart/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/gantt-chart/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about gantt-chart

How to install gantt-chart in Claude Code?

Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill gantt-chart -a claude-code to add the skill to ~/.claude/skills/gantt-chart/SKILL.md.

What does gantt-chart do?

Builds Gantt charts from a construction project task table. Shows dependencies, progress, critical path, exports to text, Mermaid and HTML.

What dependency types does gantt-chart support?

Four: finish-to-start (FS), start-to-start (SS), finish-to-finish (FF) and start-to-finish (SF). Each can have a lag in days.

Source text

SKILL.md · MIT
---
name: "gantt-chart"
description: "Generate Gantt charts for construction scheduling. Create visual project timelines with dependencies and progress tracking."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🎬", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# Gantt Chart Generator

## Business Case

### Problem Statement
Schedule visualization challenges:
- Complex task dependencies
- Progress tracking
- Critical path visibility
- Multi-level WBS display

### Solution
Generate interactive Gantt charts from schedule data with dependency visualization, progress tracking, and export capabilities.

## Technical Implementation

```python
import pandas as pd
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from datetime import date, timedelta
from enum import Enum


class TaskStatus(Enum):
    NOT_STARTED = "not_started"
    IN_PROGRESS = "in_progress"
    COMPLETED = "completed"
    DELAYED = "delayed"
    ON_HOLD = "on_hold"


class DependencyType(Enum):
    FS = "finish_to_start"
    SS = "start_to_start"
    FF = "finish_to_finish"
    SF = "start_to_finish"


@dataclass
class Task:
    task_id: str
    name: str
    start_date: date
    end_date: date
    wbs_code: str = ""
    progress: float = 0  # 0-100
    status: TaskStatus = TaskStatus.NOT_STARTED
    assignee: str = ""
    level: int = 0
    is_milestone: bool = False
    is_summary: bool = False
    parent_id: str = ""


@dataclass
class Dependency:
    predecessor_id: str
    successor_id: str
    dep_type: DependencyType = DependencyType.FS
    lag: int = 0


class GanttChartGenerator:
    """Generate Gantt charts for construction scheduling."""

    def __init__(self, project_name: str):
        self.project_name = project_name
        self.tasks: Dict[str, Task] = {}
        self.dependencies: List[Dependency] = []

    def add_task(self, task: Task):
        """Add task to chart."""
        self.tasks[task.task_id] = task

    def add_dependency(self, predecessor_id: str, successor_id: str,
                       dep_type: DependencyType = DependencyType.FS,
                       lag: int = 0):
        """Add dependency between tasks."""
        self.dependencies.append(Dependency(
            predecessor_id=predecessor_id,
            successor_id=successor_id,
            dep_type=dep_type,
            lag=lag
        ))

    def import_from_df(self, df: pd.DataFrame):
        """Import tasks from DataFrame."""

        for _, row in df.iterrows():
            task = Task(
                task_id=str(row['task_id']),
                name=row['name'],
                start_date=pd.to_datetime(row['start_date']).date(),
                end_date=pd.to_datetime(row['end_date']).date(),
                wbs_code=str(row.get('wbs_code', '')),
                progress=float(row.get('progress', 0)),
                level=int(row.get('level', 0)),
                is_milestone=bool(row.get('is_milestone', False)),
                is_summary=bool(row.get('is_summary', False)),
                parent_id=str(row.get('parent_id', ''))
            )
            self.add_task(task)

    def get_project_range(self) -> tuple:
        """Get project date range."""

        if not self.tasks:
            return (date.today(), date.today())

        min_date = min(t.start_date for t in self.tasks.values())
        max_date = max(t.end_date for t in self.tasks.values())
        return (min_date, max_date)

    def get_duration(self, task_id: str) -> int:
        """Get task duration in days."""

        task = self.tasks.get(task_id)
        if task:
            return (task.end_date - task.start_date).days + 1
        return 0

    def generate_text_gantt(self, width: int = 60) -> str:
        """Generate text-based Gantt chart."""

        if not self.tasks:
            return "No tasks"

        lines = []
        start, end = self.get_project_range()
        total_days = (end - start).days + 1
        scale = width / total_days if total_days > 0 else 1

        # Header
        lines.append(f"Project: {self.project_name}")
        lines.append(f"Period: {start} to {end}")
        lines.append("-" * (40 + width))

        # Tasks
        for task in sorted(self.tasks.values(), key=lambda t: (t.level, t.start_date)):
            indent = "  " * task.level
            name = f"{indent}{task.name}"[:35].ljust(35)

            # Bar position
            bar_start = int((task.start_date - start).days * scale)
            bar_length = max(1, int(self.get_duration(task.task_id) * scale))

            # Progress bar
            progress_length = int(bar_length * task.progress / 100)
            bar = " " * bar_start
            bar += "█" * progress_length
            bar += "░" * (bar_length - progress_length)
            bar = bar[:width].ljust(width)

            status_char = "◆" if task.is_milestone else "│"
            lines.append(f"{name} {status_char}{bar}│ {task.progress:.0f}%")

        return "\n".join(lines)

    def generate_mermaid_gantt(self) -> str:
        """Generate Mermaid Gantt diagram."""

        lines = [
            "gantt",
            f"    title {self.project_name}",
            "    dateFormat YYYY-MM-DD",
            ""
        ]

        # Group by WBS prefix
        sections = {}
        for task in self.tasks.values():
            section = task.wbs_code.split('.')[0] if task.wbs_code else "Tasks"
            if section not in sections:
                sections[section] = []
            sections[section].append(task)

        for section, tasks in sections.items():
            lines.append(f"    section {section}")
            for task in sorted(tasks, key=lambda t: t.start_date):
                duration = self.get_duration(task.task_id)
                status = ""
                if task.status == TaskStatus.COMPLETED:
                    status = "done, "
                elif task.status == TaskStatus.IN_PROGRESS:
                    status = "active, "

                if task.is_milestone:
                    lines.append(f"    {task.name} :milestone, {task.start_date}, 0d")
                else:
                    lines.append(f"    {task.name} :{status}{task.task_id}, {task.start_date}, {duration}d")

        return "\n".join(lines)

    def generate_html_gantt(self) -> str:
        """Generate HTML/CSS Gantt chart."""

        start, end = self.get_project_range()
        total_days = (end - start).days + 1

        html = f"""
<!DOCTYPE html>
<html>
<head>
    <title>Gantt Chart - {self.project_name}</title>
    <style>
        .gantt {{ font-family: Arial, sans-serif; }}
        .task {{ display: flex; margin: 2px 0; height: 25px; align-items: center; }}
        .task-name {{ width: 200px; padding-right: 10px; font-size: 12px; }}
        .task-bar {{ position: relative; height: 20px; background: #e0e0e0; flex: 1; }}
        .bar {{ position: absolute; height: 100%; }}
        .bar-fill {{ background: #4CAF50; }}
        .bar-progress {{ background: #2196F3; }}
        .milestone {{ width: 10px; height: 10px; background: #FF5722; transform: rotate(45deg); margin-left: 10px; }}
    </style>
</head>
<body>
    <div class="gantt">
        <h2>{self.project_name}</h2>
        <p>{start} - {end}</p>
"""

        for task in sorted(self.tasks.values(), key=lambda t: (t.level, t.start_date)):
            left = ((task.start_date - start).days / total_days) * 100
            width = (self.get_duration(task.task_id) / total_days) * 100
            progress_width = width * task.progress / 100

            indent = "&nbsp;" * (task.level * 4)

            if task.is_milestone:
                html += f'<div class="task"><div class="task-name">{indent}{task.name}</div><div class="task-bar"><div class="milestone" style="left:{left}%"></div></div></div>\n'
            else:
                html += f'''<div class="task">
    <div class="task-name">{indent}{task.name}</div>
    <div class="task-bar">
        <div class="bar bar-fill" style="left:{left}%; width:{width}%"></div>
        <div class="bar bar-progress" style="left:{left}%; width:{progress_width}%"></div>
    </div>
</div>\n'''

        html += "</div></body></html>"
        return html

    def get_critical_path(self) -> List[str]:
        """Identify critical path tasks (simplified)."""

        if not self.dependencies:
            return [t.task_id for t in sorted(self.tasks.values(), key=lambda x: x.end_date)[-5:]]

        # Find tasks with no slack (simplified approach)
        critical = []
        _, project_end = self.get_project_range()

        for task in self.tasks.values():
            if task.end_date == project_end:
                critical.append(task.task_id)
                # Trace predecessors
                for dep in self.dependencies:
                    if dep.successor_id == task.task_id:
                        critical.append(dep.predecessor_id)

        return list(set(critical))

    def export_to_excel(self, output_path: str) -> str:
        """Export Gantt data to Excel."""

        with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
            # Tasks
            tasks_df = pd.DataFrame([{
                'ID': t.task_id,
                'WBS': t.wbs_code,
                'Name': t.name,
                'Start': t.start_date,
                'End': t.end_date,
                'Duration': self.get_duration(t.task_id),
                'Progress': t.progress,
                'Status': t.status.value,
                'Level': t.level
            } for t in self.tasks.values()])
            tasks_df.to_excel(writer, sheet_name='Tasks', index=False)

            # Dependencies
            deps_df = pd.DataFrame([{
                'Predecessor': d.predecessor_id,
                'Successor': d.successor_id,
                'Type': d.dep_type.value,
                'Lag': d.lag
            } for d in self.dependencies])
            deps_df.to_excel(writer, sheet_name='Dependencies', index=False)

        return output_path
```

## Quick Start

```python
from datetime import date, timedelta

# Create Gantt chart
gantt = GanttChartGenerator("Office Building A")

# Add tasks
gantt.add_task(Task("T1", "Foundation", date(2024, 6, 1), date(2024, 6, 30), "01", progress=100))
gantt.add_task(Task("T2", "Structure", date(2024, 7, 1), date(2024, 9, 30), "02", progress=60))
gantt.add_task(Task("T3", "MEP Rough-in", date(2024, 8, 1), date(2024, 10, 31), "03", progress=30))
gantt.add_task(Task("M1", "Topping Out", date(2024, 9, 30), date(2024, 9, 30), is_milestone=True))

# Add dependencies
gantt.add_dependency("T1", "T2")
gantt.add_dependency("T2", "T3")

# Generate text Gantt
print(gantt.generate_text_gantt())
```

## Common Use Cases

### 1. Mermaid Diagram
```python
mermaid = gantt.generate_mermaid_gantt()
print(mermaid)  # Copy to Mermaid editor
```

### 2. HTML Export
```python
html = gantt.generate_html_gantt()
with open("gantt.html", "w") as f:
    f.write(html)
```

### 3. Critical Path
```python
critical = gantt.get_critical_path()
print(f"Critical tasks: {critical}")
```

## Resources
- **DDC Book**: Chapter 3.3 - 4D Scheduling and BIM
- **Website**: https://datadrivenconstruction.io

© datadrivenconstruction · MIT · datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction

Similar skills

All skills for Agent setup: memory, context, orchestration →

From the same set156

The whole set →
ifc-qto-extraction ifc-qto-extraction extracts element counts, areas, volumes, and lengths from IFC and Revit models, groups them by type and level, and exports to Excel for cost estimation and material planning. CX Codex +1 178installs bim-consistency-checker bim-consistency-checker audits BIM model consistency across names, parameters, relationships, and element data. Use it to catch model issues before delivery. CX Codex +1 177installs estimate-builder estimate-builder generates construction project estimates with itemized costs and markups. Useful for computing direct expenses, overhead, and grand totals. CX Codex +1 172installs ifc-to-excel ifc-to-excel is a Claude Code skill that converts IFC models into Excel data and Collada geometry. It extracts model properties and processes folders of IFC files. CX Codex +1 163installs pandas-construction-analysis pandas-construction-analysis — a skill that equips Claude Code with Pandas operations for construction data: filter BIM elements, calculate volumes, merge datasets, generate reports. Requires Python 3 in your system. CX Codex +1 153installs xlsx-construction xlsx-construction enables AI agents to generate and edit Excel files for construction workflows: cost estimates, task schedules, RFI logs, and quantity takeoffs. Creates templates with formulas and formatting. CX Codex +1 150installs pdf-to-structured pdf-to-structured extracts tables, bills of materials, and specifications from construction PDFs into Excel, CSV, and JSON. Handles both scanned files and native PDFs. CX Codex +1 149installs open-construction-estimate open-construction-estimate matches BIM elements with standardized work items and looks up unit prices in open construction databases. Use it to build a project cost estimate from element descriptions. CX Codex +1 149installs