fjsp-baseline-repair-with-downtime-and-policy — Claude Code skill
fjsp-baseline-repair-with-downtime-and-policy repairs flexible job shop schedules by resolving downtime conflicts, operation precedence issues, and budget constraints.
Apache-2.0 32 installs ★ 1,933 updated 2026-10-24
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a claude-codeWhat fjsp-baseline-repair-with-downtime-and-policy does
This skill repairs infeasible or suboptimal baseline schedules for flexible job shop planning (FJSP). It eliminates overlapping tasks on identical machines, respects scheduled machine downtime windows, and enforces job precedence so that end(j, o) <= start(j, o+1). All adjustments respect preset budgets for machine substitutions and total start-time drift.
The algorithm processes operations in a precedence-aware sequence. For each step, it calculates an anchor anchor(j, o) = max(start_base(j, o), end_new(j, o-1)) and scans integer timestamps forward by +1 to locate the earliest available slot. Jumping directly to open gaps without integer verification breaks schedule minimality.
When a baseline assignment assigns an invalid machine, the script falls back to an eligible machine with the shortest duration. Alternate machines are evaluated only when the delay exceeds an activation threshold, avoiding unnecessary budget exhaustion.
What it helps with
- Resolve operation overlaps against machine downtime windows
- Enforce sequential job precedence across multi-stage manufacturing tasks
- Minimize schedule makespan within strict machine-change limits
- Cap cumulative start-time L1 drift relative to the initial plan
Example prompts for the agent
- Repair the manufacturing FJSP schedule to account for machine downtime
- Resolve operation overlaps while keeping machine changes within budget
- Recompute operation start times without breaking technological precedence
How to install fjsp-baseline-repair-with-downtime-and-policy
1Skills CLI (Vercel)
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a claude-code2Manually: put the files in place
~/.claude/skills/fjsp-baseline-repair-with-downtime-and-policy/SKILL.mdCopy the whole skill folder; for one project use .claude/skills/fjsp-baseline-repair-with-downtime-and-policy/
1Skills CLI (Vercel)
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a codex2Manually: put the files in place
.agents/skills/fjsp-baseline-repair-with-downtime-and-policy/SKILL.mdFor all projects use ~/.agents/skills/
1Skills CLI (Vercel)
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a cursor2Manually: put the files in place
.cursor/skills/fjsp-baseline-repair-with-downtime-and-policy/SKILL.mdCursor also reads .agents/skills/ and .claude/skills/
1GitHub CLI
gh skill install benchflow-ai/skillsbench tasks/manufacturing-fjsp-optimization/environment/skills/fjsp-baseline-repair-with-downtime-and-policy2Manually: put the files in place
.github/skills/fjsp-baseline-repair-with-downtime-and-policy/SKILL.md1Skills CLI (Vercel)
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a gemini-cli2Platform CLI
gemini skills install https://github.com/benchflow-ai/skillsbench --path tasks/manufacturing-fjsp-optimization/environment/skills/fjsp-baseline-repair-with-downtime-and-policyManually: put the files in place
.devin/skills/fjsp-baseline-repair-with-downtime-and-policy/SKILL.mdThe legacy .windsurf/skills/ path still works
Skills CLI (Vercel)
npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a opencodeClaude.ai
Zip the folder and upload it in Settings → Capabilities → Skills
Step by step, with commands for each platform: How to install skills in Claude Code: five ways
Questions about fjsp-baseline-repair-with-downtime-and-policy
How to install fjsp-baseline-repair-with-downtime-and-policy in Claude Code?
Run npx skills add benchflow-ai/skillsbench --skill fjsp-baseline-repair-with-downtime-and-policy -a claude-code.
What is the purpose of this skill?
It adjusts flawed FJSP plans into feasible schedules that honor maintenance downtimes, precedence orders, and shift budgets.
Why does the algorithm increment time by +1 instead of jumping to gaps?
Skipping integer steps forward risks missing earlier feasible slots, which compromises schedule minimality guarantees.
Source text
SKILL.md · Apache-2.0
---
name: fjsp-baseline-repair-with-downtime-and-policy
description: This skill should be considered when you need to repair an infeasible or non-optimal flexible job scheduling planning schedule into a downtime-feasible, precedence-feasible one while keep no worse policy budget.
---
This skill should be considered when you need to enhance a given infeasible or non-optimal fjsp baseline to a feasible schedule with less makespan considering downtime constraints, job precedence violations, policy budget constraints. The following constraints should be satisfied. end(j, o) <= start(j, o+1). Here j means the job index and o means the operation index. There should be no overlaps on the same machine or with downtime windows. Keep the number of machine changes and the total L1 start-time shift within the policy budgets. You can calculate the number of machine changes by MC = \sum_{(j,o)} [m_{new}(j,o) \ne m_{base}(j,o)]. You can calculate the total L1 start-time shift by Shift_{L1} = \sum_{(j,o)} |start_{new}(j,o) - start_{base}(j,o)|. To achieve this, never start any operation earlier than the baseline. When repairing operations in precedence-aware order, place each operation at the earliest feasible time. Anchor is calculated by anchor(j,o) = \max(start_{base}(j,o), end_{new}(j,o-1)), end_{new}(j,o-1) is end time of the previous operation of the same job at the new schedule. If start > anchor, then start-1 must be infeasible. You guarantee this by scanning integer time forward by +1 from anchor. Jumping to “next gap” without checking every integer may break minimality. If the given baseline is invalid, replace the machine with a feasible one.
Here is the pipeline. For each operation, first find the earliest time to start. It cannot start earlier than the baseline, and it cannot start before the previous operation of the same job finishes. Then list only the machines that are allowed for this operation, and use the processing time that belongs to each machine. For each candidate machine, find the allowed earliest time and pick the first start time that does not overlap with other work on that machine and does not fall into any downtime window. Choose the option that makes the smallest changes overall. Prefer not changing machines and keeping start-time shifts small, and make sure you stay within the policy budgets. After selecting a start time, immediately record this operation on the machine timeline in the same precedence-aware order, so the result matches the evaluator’s step-by-step simulation.
Here are reference codes.
```python
# sorted Downtime windows
downtime[m] = sorted([(start,end), ...])
def overlap(s,e,a,b):
return s < b and a < e
```
```python
# Precedence-aware repair order
def precedence_aware_order(base_list):
base_map = {(r["job"], r["op"]): r for r in base_list}
base_index = {(r["job"], r["op"]): i for i, r in enumerate(base_list)}
keys = list(base_map.keys())
keys.sort(key=lambda k: (k[1], base_map[k]["start"], base_index[k]))
return keys
```
```python
def earliest_feasible_time(m, anchor, dur, machine_intervals, downtime, safety=200000):
t = int(anchor)
for _ in range(safety):
if not has_conflict(m, t, t+dur, machine_intervals, downtime):
return t
t += 1
return t
```
```python
def has_conflict(m, st, en, machine_intervals, downtime):
for a,b in machine_intervals.get(m, []):
if overlap(st,en,a,b):
return True
for a,b in downtime.get(m, []):
if overlap(st,en,a,b):
return True
return False
```
```python
# Baseline machine may be illegal
base_m = base_map[(j,o)]["machine"]
if base_m not in allowed[(j,o)]:
# baseline is invalid; pick a legal default (min duration is a good heuristic)
base_m = min(allowed[(j,o)], key=lambda m: allowed[(j,o)][m])
base_d = allowed[(j,o)][base_m]
```
```python
#Use a lexicographic score that matches your priorities
machine_change = int(mm != base_m_orig)
start_shift = abs(st - base_start)
score = (machine_change, start_shift, st, mm)
#Then pick the smallest score, but respect remaining machine-change budget.
```
```python
#A naive “always keep baseline machine” can cause large start shifts. This often reduces `Shift_L1` enough to pass tight budgets without exploding machine changes. Use a simple trigger to consider alternates *only when it helps*:
THRESH = 6 # tune; small instances often 3~10 works
# First try baseline machine
cand = best_candidate_restricted_to([base_m])
# If shift is large and we still can change machines, search alternates
if (cand.start - base_start) >= THRESH and mc_used < max_mc:
cand2 = best_candidate_over_all_allowed_machines()
if cand2.start < cand.start: # or cand2.shift < cand.shift
cand = cand2
```