capacity-planning — Claude Code skill: what it does, how to install
capacity-planning forecasts staffing demand and identifies workforce gaps across construction projects. Helps evaluate capacity before pursuing new bids.
MIT 115 installs ★ 434 updated 2026-10-19
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-codeWhat capacity-planning does
The skill models construction organization staffing via Python dataclasses. It defines roles such as project managers, superintendents, and schedulers across stages from pursuit to closeout. Workload formulas tie role ratios directly to project value — for example, one project manager per $20M and one superintendent per $10M, adjusted by project phase multipliers.
It combines active contracts with weighted pipeline bids to detect deficits. The planner outputs a CapacityForecast detailing utilization rates and shortages by role. Without python3 installed on the host machine, the planner cannot execute its calculation routines.
What it helps with
- forecast superintendent and project manager staffing against project value
- spot personnel deficits across pipeline bids and active jobsites
- adjust team allocations across preconstruction, construction, and closeout phases
- evaluate go/no-go pursuit decisions against current headcount
Example prompts for the agent
- Check staff capacity for our active jobs and upcoming $30M bid
- Forecast project engineer demand for the upcoming preconstruction phase
How to install capacity-planning
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-code2Manually: put the files in place
~/.claude/skills/capacity-planning/SKILL.mdCopy the whole skill folder; for one project use .claude/skills/capacity-planning/
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a codex2Manually: put the files in place
.agents/skills/capacity-planning/SKILL.mdFor all projects use ~/.agents/skills/
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a cursor2Manually: put the files in place
.cursor/skills/capacity-planning/SKILL.mdCursor also reads .agents/skills/ and .claude/skills/
1GitHub CLI
gh skill install datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction 5_DDC_Innovative/capacity-planning/SKILL.md2Manually: put the files in place
.github/skills/capacity-planning/SKILL.md1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a gemini-cli2Platform CLI
gemini skills install https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --path 5_DDC_Innovative/capacity-planningManually: put the files in place
.devin/skills/capacity-planning/SKILL.mdThe legacy .windsurf/skills/ path still works
Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a opencodeClaude.ai
Zip the folder and upload it in Settings → Capabilities → Skills
Step by step, with commands for each platform: How to install skills in Claude Code: five ways
Questions about capacity-planning
How to install capacity-planning in Claude Code?
Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-code. The skill file will be placed in ~/.claude/skills/capacity-planning/SKILL.md.
How does capacity-planning calculate staffing requirements?
It applies preset dollar-value ratios, like one superintendent per $10M, and scales them using phase-specific multipliers.
What dependencies does capacity-planning require?
It requires a local python3 installation to run its data models and forecasting logic.
Source text
SKILL.md · MIT
---
name: "capacity-planning"
description: "Plan organizational capacity for construction projects. Forecast resource needs, identify capacity gaps, and support strategic planning for project pursuit and staffing."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🚀", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# Capacity Planning
## Overview
Strategic capacity planning for construction organizations. Forecast resource requirements based on project pipeline, identify capacity constraints, optimize staffing levels, and support go/no-go decisions on new project pursuits.
## Capacity Planning Framework
```
┌─────────────────────────────────────────────────────────────────┐
│ CAPACITY PLANNING │
├─────────────────────────────────────────────────────────────────┤
│ │
│ DEMAND FORECAST CAPACITY ANALYSIS DECISIONS │
│ ─────────────── ───────────────── ───────── │
│ │
│ Current Projects → Available: Pursue new │
│ • Project A (Active) 👷 PM: 5 project? │
│ • Project B (Active) 👷 Supers: 12 ──────── │
│ • Project C (Starting) 📐 Engineers: 8 ✅ Capacity │
│ ⚠️ Stretch │
│ Pipeline: → Required: ❌ Decline │
│ • Bid D (60% win) 👷 PM: 7 │
│ • Bid E (40% win) 👷 Supers: 15 │
│ • Opportunity F 📐 Engineers: 10 │
│ │
│ GAP ANALYSIS: ACTIONS: │
│ • PM: -2 (deficit) • Hire 2 PMs │
│ • Supers: -3 (deficit) • Promote from within │
│ • Engineers: -2 (deficit) • Partner with firm │
│ │
└─────────────────────────────────────────────────────────────────┘
```
## Technical Implementation
```python
from dataclasses import dataclass, field
from typing import List, Dict, Optional, Tuple
from datetime import datetime, timedelta
from enum import Enum
import statistics
class ResourceRole(Enum):
PROJECT_MANAGER = "project_manager"
SUPERINTENDENT = "superintendent"
PROJECT_ENGINEER = "project_engineer"
ESTIMATOR = "estimator"
SCHEDULER = "scheduler"
SAFETY_MANAGER = "safety_manager"
QC_MANAGER = "qc_manager"
ADMIN = "admin"
class ProjectPhase(Enum):
PURSUIT = "pursuit"
PRECONSTRUCTION = "preconstruction"
CONSTRUCTION = "construction"
CLOSEOUT = "closeout"
class OpportunityStatus(Enum):
IDENTIFIED = "identified"
PURSUING = "pursuing"
BID_SUBMITTED = "bid_submitted"
NEGOTIATING = "negotiating"
WON = "won"
LOST = "lost"
@dataclass
class StaffMember:
id: str
name: str
role: ResourceRole
capacity: float = 1.0 # FTE
current_assignment: str = ""
availability_date: datetime = None
skills: List[str] = field(default_factory=list)
max_project_value: float = 0 # Max project size they can handle
@dataclass
class ProjectDemand:
project_id: str
project_name: str
value: float
phase: ProjectPhase
start_date: datetime
end_date: datetime
probability: float = 1.0 # 1.0 for active, <1 for pipeline
resource_needs: Dict[ResourceRole, float] = field(default_factory=dict)
@dataclass
class CapacityGap:
role: ResourceRole
period_start: datetime
period_end: datetime
demand: float
capacity: float
gap: float
severity: str
@dataclass
class CapacityForecast:
forecast_date: datetime
horizon_months: int
total_demand_fte: float
total_capacity_fte: float
utilization_pct: float
gaps: List[CapacityGap]
recommendations: List[str]
class CapacityPlanner:
"""Plan organizational capacity for construction projects."""
# Typical staffing ratios by project value
STAFFING_RATIOS = {
ResourceRole.PROJECT_MANAGER: 20000000, # 1 PM per $20M
ResourceRole.SUPERINTENDENT: 10000000, # 1 Super per $10M
ResourceRole.PROJECT_ENGINEER: 15000000, # 1 PE per $15M
ResourceRole.ESTIMATOR: 50000000, # 1 Estimator per $50M (pursuit)
ResourceRole.SCHEDULER: 30000000, # 1 Scheduler per $30M
ResourceRole.SAFETY_MANAGER: 25000000, # 1 Safety per $25M
}
# Phase factors (multiply by role ratio)
PHASE_FACTORS = {
ProjectPhase.PURSUIT: {"estimator": 1.5, "pm": 0.3},
ProjectPhase.PRECONSTRUCTION: {"pm": 0.7, "pe": 0.5, "scheduler": 0.5},
ProjectPhase.CONSTRUCTION: {"pm": 1.0, "super": 1.0, "pe": 1.0, "safety": 1.0},
ProjectPhase.CLOSEOUT: {"pm": 0.5, "pe": 0.3, "admin": 1.0}
}
def __init__(self, organization_name: str):
self.organization_name = organization_name
self.staff: Dict[str, StaffMember] = {}
self.projects: Dict[str, ProjectDemand] = {}
self.pipeline: Dict[str, ProjectDemand] = {}
def add_staff(self, id: str, name: str, role: ResourceRole,
capacity: float = 1.0, current_assignment: str = "",
availability_date: datetime = None,
max_project_value: float = 0) -> StaffMember:
"""Add staff member to capacity pool."""
member = StaffMember(
id=id,
name=name,
role=role,
capacity=capacity,
current_assignment=current_assignment,
availability_date=availability_date or datetime.now(),
max_project_value=max_project_value
)
self.staff[id] = member
return member
def add_active_project(self, id: str, name: str, value: float,
phase: ProjectPhase, start_date: datetime,
end_date: datetime) -> ProjectDemand:
"""Add active project to demand forecast."""
# Calculate resource needs based on value and phase
needs = self._calculate_resource_needs(value, phase)
project = ProjectDemand(
project_id=id,
project_name=name,
value=value,
phase=phase,
start_date=start_date,
end_date=end_date,
probability=1.0,
resource_needs=needs
)
self.projects[id] = project
return project
def add_pipeline_opportunity(self, id: str, name: str, value: float,
win_probability: float,
expected_start: datetime,
duration_months: int) -> ProjectDemand:
"""Add pipeline opportunity to demand forecast."""
needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)
opportunity = ProjectDemand(
project_id=id,
project_name=name,
value=value,
phase=ProjectPhase.PURSUIT,
start_date=expected_start,
end_date=expected_start + timedelta(days=duration_months * 30),
probability=win_probability,
resource_needs=needs
)
self.pipeline[id] = opportunity
return opportunity
def _calculate_resource_needs(self, value: float,
phase: ProjectPhase) -> Dict[ResourceRole, float]:
"""Calculate resource needs based on project value and phase."""
needs = {}
for role, ratio in self.STAFFING_RATIOS.items():
base_need = value / ratio
# Apply phase factor
phase_key = role.value.split('_')[0][:3]
factor = 1.0
if phase in self.PHASE_FACTORS:
factor = self.PHASE_FACTORS[phase].get(phase_key, 1.0)
needs[role] = base_need * factor
return needs
def get_current_capacity(self) -> Dict[ResourceRole, float]:
"""Get current capacity by role."""
capacity = {role: 0.0 for role in ResourceRole}
for member in self.staff.values():
if member.availability_date <= datetime.now():
capacity[member.role] += member.capacity
return capacity
def get_capacity_at_date(self, target_date: datetime) -> Dict[ResourceRole, float]:
"""Get projected capacity at future date."""
capacity = {role: 0.0 for role in ResourceRole}
for member in self.staff.values():
if member.availability_date <= target_date:
capacity[member.role] += member.capacity
return capacity
def calculate_demand(self, target_date: datetime,
include_pipeline: bool = True,
pipeline_threshold: float = 0.0) -> Dict[ResourceRole, float]:
"""Calculate resource demand at date."""
demand = {role: 0.0 for role in ResourceRole}
# Active projects
for project in self.projects.values():
if project.start_date <= target_date <= project.end_date:
for role, need in project.resource_needs.items():
demand[role] += need * project.probability
# Pipeline (weighted by probability)
if include_pipeline:
for opp in self.pipeline.values():
if opp.probability >= pipeline_threshold:
if opp.start_date <= target_date <= opp.end_date:
for role, need in opp.resource_needs.items():
demand[role] += need * opp.probability
return demand
def identify_gaps(self, horizon_months: int = 12) -> List[CapacityGap]:
"""Identify capacity gaps over forecast horizon."""
gaps = []
for month in range(horizon_months):
period_start = datetime.now() + timedelta(days=month * 30)
period_end = period_start + timedelta(days=30)
capacity = self.get_capacity_at_date(period_start)
demand = self.calculate_demand(period_start, include_pipeline=True)
for role in ResourceRole:
cap = capacity.get(role, 0)
dem = demand.get(role, 0)
gap = cap - dem
if gap < 0:
severity = "critical" if gap < -1 else "warning"
gaps.append(CapacityGap(
role=role,
period_start=period_start,
period_end=period_end,
demand=dem,
capacity=cap,
gap=gap,
severity=severity
))
return gaps
def can_pursue_project(self, value: float, start_date: datetime,
duration_months: int) -> Dict:
"""Evaluate if organization can pursue new project."""
# Calculate needs for potential project
needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)
end_date = start_date + timedelta(days=duration_months * 30)
# Check capacity over project duration
can_staff = True
bottlenecks = []
current_date = start_date
while current_date <= end_date:
capacity = self.get_capacity_at_date(current_date)
demand = self.calculate_demand(current_date)
for role, need in needs.items():
available = capacity.get(role, 0) - demand.get(role, 0)
if need > available:
can_staff = False
bottlenecks.append({
"date": current_date,
"role": role.value,
"needed": need,
"available": available,
"gap": need - available
})
current_date += timedelta(days=30)
# Determine recommendation
if can_staff:
recommendation = "GO - Sufficient capacity"
elif len(bottlenecks) <= 2:
recommendation = "CONDITIONAL - Minor gaps, consider hiring"
else:
recommendation = "CAUTION - Significant capacity constraints"
return {
"can_staff": can_staff,
"recommendation": recommendation,
"resource_needs": {r.value: v for r, v in needs.items()},
"bottlenecks": bottlenecks[:10],
"actions_required": self._suggest_hiring(bottlenecks)
}
def _suggest_hiring(self, bottlenecks: List[Dict]) -> List[str]:
"""Suggest hiring actions based on gaps."""
if not bottlenecks:
return []
# Aggregate gaps by role
role_gaps = {}
for b in bottlenecks:
role = b['role']
if role not in role_gaps:
role_gaps[role] = 0
role_gaps[role] = max(role_gaps[role], b['gap'])
actions = []
for role, gap in sorted(role_gaps.items(), key=lambda x: -x[1]):
hires = int(gap) + 1
actions.append(f"Hire {hires} {role}(s) - Gap: {gap:.1f} FTE")
return actions
def generate_forecast(self, horizon_months: int = 12) -> CapacityForecast:
"""Generate capacity forecast."""
gaps = self.identify_gaps(horizon_months)
# Calculate totals
capacity = self.get_current_capacity()
demand = self.calculate_demand(datetime.now())
total_capacity = sum(capacity.values())
total_demand = sum(demand.values())
utilization = (total_demand / total_capacity * 100) if total_capacity > 0 else 0
# Generate recommendations
recommendations = []
if utilization > 90:
recommendations.append("High utilization - consider hiring")
elif utilization < 60:
recommendations.append("Low utilization - review project pipeline")
# Role-specific recommendations
critical_gaps = [g for g in gaps if g.severity == "critical"]
gap_roles = set(g.role.value for g in critical_gaps)
for role in gap_roles:
recommendations.append(f"Critical gap in {role} - immediate action needed")
return CapacityForecast(
forecast_date=datetime.now(),
horizon_months=horizon_months,
total_demand_fte=total_demand,
total_capacity_fte=total_capacity,
utilization_pct=utilization,
gaps=gaps,
recommendations=recommendations
)
def generate_report(self) -> str:
"""Generate capacity planning report."""
forecast = self.generate_forecast()
lines = [
"# Capacity Planning Report",
"",
f"**Organization:** {self.organization_name}",
f"**Report Date:** {forecast.forecast_date.strftime('%Y-%m-%d')}",
"",
"## Executive Summary",
"",
f"| Metric | Value |",
f"|--------|-------|",
f"| Active Projects | {len(self.projects)} |",
f"| Pipeline Opportunities | {len(self.pipeline)} |",
f"| Total Staff | {len(self.staff)} |",
f"| Current Capacity (FTE) | {forecast.total_capacity_fte:.1f} |",
f"| Current Demand (FTE) | {forecast.total_demand_fte:.1f} |",
f"| Utilization | {forecast.utilization_pct:.0f}% |",
"",
"## Capacity by Role",
"",
"| Role | Capacity | Demand | Gap |",
"|------|----------|--------|-----|"
]
capacity = self.get_current_capacity()
demand = self.calculate_demand(datetime.now())
for role in ResourceRole:
cap = capacity.get(role, 0)
dem = demand.get(role, 0)
gap = cap - dem
gap_icon = "✅" if gap >= 0 else "⚠️" if gap > -1 else "🔴"
lines.append(
f"| {role.value} | {cap:.1f} | {dem:.1f} | {gap:+.1f} {gap_icon} |"
)
# Active projects
lines.extend([
"",
"## Active Projects",
"",
"| Project | Value | Phase | End Date |",
"|---------|-------|-------|----------|"
])
for p in sorted(self.projects.values(), key=lambda x: x.value, reverse=True):
lines.append(
f"| {p.project_name} | ${p.value:,.0f} | {p.phase.value} | "
f"{p.end_date.strftime('%Y-%m-%d')} |"
)
# Pipeline
if self.pipeline:
lines.extend([
"",
"## Pipeline",
"",
"| Opportunity | Value | Probability | Expected Start |",
"|-------------|-------|-------------|----------------|"
])
for p in sorted(self.pipeline.values(), key=lambda x: -x.probability):
lines.append(
f"| {p.project_name} | ${p.value:,.0f} | {p.probability:.0%} | "
f"{p.start_date.strftime('%Y-%m-%d')} |"
)
# Gaps
critical_gaps = [g for g in forecast.gaps if g.severity == "critical"]
if critical_gaps:
lines.extend([
"",
f"## Critical Capacity Gaps ({len(critical_gaps)})",
"",
"| Role | Period | Gap |",
"|------|--------|-----|"
])
for gap in critical_gaps[:10]:
lines.append(
f"| {gap.role.value} | {gap.period_start.strftime('%Y-%m')} | "
f"{gap.gap:.1f} FTE |"
)
# Recommendations
if forecast.recommendations:
lines.extend([
"",
"## Recommendations",
""
])
for rec in forecast.recommendations:
lines.append(f"- {rec}")
return "\n".join(lines)
```
## Quick Start
```python
from datetime import datetime, timedelta
# Initialize planner
planner = CapacityPlanner("ABC Construction")
# Add staff
planner.add_staff("PM-001", "John Smith", ResourceRole.PROJECT_MANAGER)
planner.add_staff("PM-002", "Jane Doe", ResourceRole.PROJECT_MANAGER)
planner.add_staff("SUP-001", "Mike Johnson", ResourceRole.SUPERINTENDENT)
planner.add_staff("SUP-002", "Bob Williams", ResourceRole.SUPERINTENDENT)
planner.add_staff("SUP-003", "Tom Brown", ResourceRole.SUPERINTENDENT)
planner.add_staff("PE-001", "Sarah Davis", ResourceRole.PROJECT_ENGINEER)
planner.add_staff("PE-002", "Chris Wilson", ResourceRole.PROJECT_ENGINEER)
# Add active projects
planner.add_active_project(
"PRJ-001", "Downtown Tower",
value=25000000,
phase=ProjectPhase.CONSTRUCTION,
start_date=datetime(2024, 6, 1),
end_date=datetime(2025, 12, 31)
)
planner.add_active_project(
"PRJ-002", "Hospital Wing",
value=40000000,
phase=ProjectPhase.CONSTRUCTION,
start_date=datetime(2024, 9, 1),
end_date=datetime(2026, 6, 30)
)
# Add pipeline opportunities
planner.add_pipeline_opportunity(
"OPP-001", "Office Complex",
value=30000000,
win_probability=0.6,
expected_start=datetime(2025, 3, 1),
duration_months=18
)
# Check if can pursue new project
evaluation = planner.can_pursue_project(
value=20000000,
start_date=datetime(2025, 6, 1),
duration_months=12
)
print(f"Recommendation: {evaluation['recommendation']}")
for action in evaluation['actions_required']:
print(f" - {action}")
# Generate forecast
forecast = planner.generate_forecast()
print(f"Utilization: {forecast.utilization_pct:.0f}%")
print(f"Critical gaps: {len([g for g in forecast.gaps if g.severity == 'critical'])}")
# Generate report
print(planner.generate_report())
```
## Requirements