capacity-planning — Claude Code skill: what it does, how to install

capacity-planning forecasts staffing demand and identifies workforce gaps across construction projects. Helps evaluate capacity before pursuing new bids.

MIT 115 installs ★ 434 updated 2026-10-19

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-code
Open on GitHub

What capacity-planning does

The skill models construction organization staffing via Python dataclasses. It defines roles such as project managers, superintendents, and schedulers across stages from pursuit to closeout. Workload formulas tie role ratios directly to project value — for example, one project manager per $20M and one superintendent per $10M, adjusted by project phase multipliers.

It combines active contracts with weighted pipeline bids to detect deficits. The planner outputs a CapacityForecast detailing utilization rates and shortages by role. Without python3 installed on the host machine, the planner cannot execute its calculation routines.

What it helps with

  • forecast superintendent and project manager staffing against project value
  • spot personnel deficits across pipeline bids and active jobsites
  • adjust team allocations across preconstruction, construction, and closeout phases
  • evaluate go/no-go pursuit decisions against current headcount

Example prompts for the agent

  • Check staff capacity for our active jobs and upcoming $30M bid
  • Forecast project engineer demand for the upcoming preconstruction phase

How to install capacity-planning

1Skills CLI (Vercel)

npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-code

2Manually: put the files in place

~/.claude/skills/capacity-planning/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/capacity-planning/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about capacity-planning

How to install capacity-planning in Claude Code?

Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill capacity-planning -a claude-code. The skill file will be placed in ~/.claude/skills/capacity-planning/SKILL.md.

How does capacity-planning calculate staffing requirements?

It applies preset dollar-value ratios, like one superintendent per $10M, and scales them using phase-specific multipliers.

What dependencies does capacity-planning require?

It requires a local python3 installation to run its data models and forecasting logic.

Source text

SKILL.md · MIT
---
name: "capacity-planning"
description: "Plan organizational capacity for construction projects. Forecast resource needs, identify capacity gaps, and support strategic planning for project pursuit and staffing."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🚀", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# Capacity Planning

## Overview

Strategic capacity planning for construction organizations. Forecast resource requirements based on project pipeline, identify capacity constraints, optimize staffing levels, and support go/no-go decisions on new project pursuits.

## Capacity Planning Framework

```
┌─────────────────────────────────────────────────────────────────┐
│                  CAPACITY PLANNING                               │
├─────────────────────────────────────────────────────────────────┤
│                                                                  │
│  DEMAND FORECAST           CAPACITY ANALYSIS        DECISIONS   │
│  ───────────────           ─────────────────        ─────────   │
│                                                                  │
│  Current Projects    →     Available:               Pursue new  │
│  • Project A (Active)      👷 PM: 5                 project?    │
│  • Project B (Active)      👷 Supers: 12            ────────    │
│  • Project C (Starting)    📐 Engineers: 8         ✅ Capacity  │
│                                                    ⚠️ Stretch   │
│  Pipeline:            →    Required:               ❌ Decline   │
│  • Bid D (60% win)         👷 PM: 7                             │
│  • Bid E (40% win)         👷 Supers: 15                        │
│  • Opportunity F           📐 Engineers: 10                     │
│                                                                  │
│  GAP ANALYSIS:             ACTIONS:                             │
│  • PM: -2 (deficit)        • Hire 2 PMs                         │
│  • Supers: -3 (deficit)    • Promote from within                │
│  • Engineers: -2 (deficit) • Partner with firm                  │
│                                                                  │
└─────────────────────────────────────────────────────────────────┘
```

## Technical Implementation

```python
from dataclasses import dataclass, field
from typing import List, Dict, Optional, Tuple
from datetime import datetime, timedelta
from enum import Enum
import statistics

class ResourceRole(Enum):
    PROJECT_MANAGER = "project_manager"
    SUPERINTENDENT = "superintendent"
    PROJECT_ENGINEER = "project_engineer"
    ESTIMATOR = "estimator"
    SCHEDULER = "scheduler"
    SAFETY_MANAGER = "safety_manager"
    QC_MANAGER = "qc_manager"
    ADMIN = "admin"

class ProjectPhase(Enum):
    PURSUIT = "pursuit"
    PRECONSTRUCTION = "preconstruction"
    CONSTRUCTION = "construction"
    CLOSEOUT = "closeout"

class OpportunityStatus(Enum):
    IDENTIFIED = "identified"
    PURSUING = "pursuing"
    BID_SUBMITTED = "bid_submitted"
    NEGOTIATING = "negotiating"
    WON = "won"
    LOST = "lost"

@dataclass
class StaffMember:
    id: str
    name: str
    role: ResourceRole
    capacity: float = 1.0  # FTE
    current_assignment: str = ""
    availability_date: datetime = None
    skills: List[str] = field(default_factory=list)
    max_project_value: float = 0  # Max project size they can handle

@dataclass
class ProjectDemand:
    project_id: str
    project_name: str
    value: float
    phase: ProjectPhase
    start_date: datetime
    end_date: datetime
    probability: float = 1.0  # 1.0 for active, <1 for pipeline
    resource_needs: Dict[ResourceRole, float] = field(default_factory=dict)

@dataclass
class CapacityGap:
    role: ResourceRole
    period_start: datetime
    period_end: datetime
    demand: float
    capacity: float
    gap: float
    severity: str

@dataclass
class CapacityForecast:
    forecast_date: datetime
    horizon_months: int
    total_demand_fte: float
    total_capacity_fte: float
    utilization_pct: float
    gaps: List[CapacityGap]
    recommendations: List[str]

class CapacityPlanner:
    """Plan organizational capacity for construction projects."""

    # Typical staffing ratios by project value
    STAFFING_RATIOS = {
        ResourceRole.PROJECT_MANAGER: 20000000,      # 1 PM per $20M
        ResourceRole.SUPERINTENDENT: 10000000,       # 1 Super per $10M
        ResourceRole.PROJECT_ENGINEER: 15000000,     # 1 PE per $15M
        ResourceRole.ESTIMATOR: 50000000,            # 1 Estimator per $50M (pursuit)
        ResourceRole.SCHEDULER: 30000000,            # 1 Scheduler per $30M
        ResourceRole.SAFETY_MANAGER: 25000000,       # 1 Safety per $25M
    }

    # Phase factors (multiply by role ratio)
    PHASE_FACTORS = {
        ProjectPhase.PURSUIT: {"estimator": 1.5, "pm": 0.3},
        ProjectPhase.PRECONSTRUCTION: {"pm": 0.7, "pe": 0.5, "scheduler": 0.5},
        ProjectPhase.CONSTRUCTION: {"pm": 1.0, "super": 1.0, "pe": 1.0, "safety": 1.0},
        ProjectPhase.CLOSEOUT: {"pm": 0.5, "pe": 0.3, "admin": 1.0}
    }

    def __init__(self, organization_name: str):
        self.organization_name = organization_name
        self.staff: Dict[str, StaffMember] = {}
        self.projects: Dict[str, ProjectDemand] = {}
        self.pipeline: Dict[str, ProjectDemand] = {}

    def add_staff(self, id: str, name: str, role: ResourceRole,
                 capacity: float = 1.0, current_assignment: str = "",
                 availability_date: datetime = None,
                 max_project_value: float = 0) -> StaffMember:
        """Add staff member to capacity pool."""
        member = StaffMember(
            id=id,
            name=name,
            role=role,
            capacity=capacity,
            current_assignment=current_assignment,
            availability_date=availability_date or datetime.now(),
            max_project_value=max_project_value
        )
        self.staff[id] = member
        return member

    def add_active_project(self, id: str, name: str, value: float,
                          phase: ProjectPhase, start_date: datetime,
                          end_date: datetime) -> ProjectDemand:
        """Add active project to demand forecast."""
        # Calculate resource needs based on value and phase
        needs = self._calculate_resource_needs(value, phase)

        project = ProjectDemand(
            project_id=id,
            project_name=name,
            value=value,
            phase=phase,
            start_date=start_date,
            end_date=end_date,
            probability=1.0,
            resource_needs=needs
        )
        self.projects[id] = project
        return project

    def add_pipeline_opportunity(self, id: str, name: str, value: float,
                                 win_probability: float,
                                 expected_start: datetime,
                                 duration_months: int) -> ProjectDemand:
        """Add pipeline opportunity to demand forecast."""
        needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)

        opportunity = ProjectDemand(
            project_id=id,
            project_name=name,
            value=value,
            phase=ProjectPhase.PURSUIT,
            start_date=expected_start,
            end_date=expected_start + timedelta(days=duration_months * 30),
            probability=win_probability,
            resource_needs=needs
        )
        self.pipeline[id] = opportunity
        return opportunity

    def _calculate_resource_needs(self, value: float,
                                  phase: ProjectPhase) -> Dict[ResourceRole, float]:
        """Calculate resource needs based on project value and phase."""
        needs = {}

        for role, ratio in self.STAFFING_RATIOS.items():
            base_need = value / ratio

            # Apply phase factor
            phase_key = role.value.split('_')[0][:3]
            factor = 1.0
            if phase in self.PHASE_FACTORS:
                factor = self.PHASE_FACTORS[phase].get(phase_key, 1.0)

            needs[role] = base_need * factor

        return needs

    def get_current_capacity(self) -> Dict[ResourceRole, float]:
        """Get current capacity by role."""
        capacity = {role: 0.0 for role in ResourceRole}

        for member in self.staff.values():
            if member.availability_date <= datetime.now():
                capacity[member.role] += member.capacity

        return capacity

    def get_capacity_at_date(self, target_date: datetime) -> Dict[ResourceRole, float]:
        """Get projected capacity at future date."""
        capacity = {role: 0.0 for role in ResourceRole}

        for member in self.staff.values():
            if member.availability_date <= target_date:
                capacity[member.role] += member.capacity

        return capacity

    def calculate_demand(self, target_date: datetime,
                        include_pipeline: bool = True,
                        pipeline_threshold: float = 0.0) -> Dict[ResourceRole, float]:
        """Calculate resource demand at date."""
        demand = {role: 0.0 for role in ResourceRole}

        # Active projects
        for project in self.projects.values():
            if project.start_date <= target_date <= project.end_date:
                for role, need in project.resource_needs.items():
                    demand[role] += need * project.probability

        # Pipeline (weighted by probability)
        if include_pipeline:
            for opp in self.pipeline.values():
                if opp.probability >= pipeline_threshold:
                    if opp.start_date <= target_date <= opp.end_date:
                        for role, need in opp.resource_needs.items():
                            demand[role] += need * opp.probability

        return demand

    def identify_gaps(self, horizon_months: int = 12) -> List[CapacityGap]:
        """Identify capacity gaps over forecast horizon."""
        gaps = []

        for month in range(horizon_months):
            period_start = datetime.now() + timedelta(days=month * 30)
            period_end = period_start + timedelta(days=30)

            capacity = self.get_capacity_at_date(period_start)
            demand = self.calculate_demand(period_start, include_pipeline=True)

            for role in ResourceRole:
                cap = capacity.get(role, 0)
                dem = demand.get(role, 0)
                gap = cap - dem

                if gap < 0:
                    severity = "critical" if gap < -1 else "warning"
                    gaps.append(CapacityGap(
                        role=role,
                        period_start=period_start,
                        period_end=period_end,
                        demand=dem,
                        capacity=cap,
                        gap=gap,
                        severity=severity
                    ))

        return gaps

    def can_pursue_project(self, value: float, start_date: datetime,
                          duration_months: int) -> Dict:
        """Evaluate if organization can pursue new project."""
        # Calculate needs for potential project
        needs = self._calculate_resource_needs(value, ProjectPhase.CONSTRUCTION)
        end_date = start_date + timedelta(days=duration_months * 30)

        # Check capacity over project duration
        can_staff = True
        bottlenecks = []

        current_date = start_date
        while current_date <= end_date:
            capacity = self.get_capacity_at_date(current_date)
            demand = self.calculate_demand(current_date)

            for role, need in needs.items():
                available = capacity.get(role, 0) - demand.get(role, 0)
                if need > available:
                    can_staff = False
                    bottlenecks.append({
                        "date": current_date,
                        "role": role.value,
                        "needed": need,
                        "available": available,
                        "gap": need - available
                    })

            current_date += timedelta(days=30)

        # Determine recommendation
        if can_staff:
            recommendation = "GO - Sufficient capacity"
        elif len(bottlenecks) <= 2:
            recommendation = "CONDITIONAL - Minor gaps, consider hiring"
        else:
            recommendation = "CAUTION - Significant capacity constraints"

        return {
            "can_staff": can_staff,
            "recommendation": recommendation,
            "resource_needs": {r.value: v for r, v in needs.items()},
            "bottlenecks": bottlenecks[:10],
            "actions_required": self._suggest_hiring(bottlenecks)
        }

    def _suggest_hiring(self, bottlenecks: List[Dict]) -> List[str]:
        """Suggest hiring actions based on gaps."""
        if not bottlenecks:
            return []

        # Aggregate gaps by role
        role_gaps = {}
        for b in bottlenecks:
            role = b['role']
            if role not in role_gaps:
                role_gaps[role] = 0
            role_gaps[role] = max(role_gaps[role], b['gap'])

        actions = []
        for role, gap in sorted(role_gaps.items(), key=lambda x: -x[1]):
            hires = int(gap) + 1
            actions.append(f"Hire {hires} {role}(s) - Gap: {gap:.1f} FTE")

        return actions

    def generate_forecast(self, horizon_months: int = 12) -> CapacityForecast:
        """Generate capacity forecast."""
        gaps = self.identify_gaps(horizon_months)

        # Calculate totals
        capacity = self.get_current_capacity()
        demand = self.calculate_demand(datetime.now())

        total_capacity = sum(capacity.values())
        total_demand = sum(demand.values())
        utilization = (total_demand / total_capacity * 100) if total_capacity > 0 else 0

        # Generate recommendations
        recommendations = []

        if utilization > 90:
            recommendations.append("High utilization - consider hiring")
        elif utilization < 60:
            recommendations.append("Low utilization - review project pipeline")

        # Role-specific recommendations
        critical_gaps = [g for g in gaps if g.severity == "critical"]
        gap_roles = set(g.role.value for g in critical_gaps)
        for role in gap_roles:
            recommendations.append(f"Critical gap in {role} - immediate action needed")

        return CapacityForecast(
            forecast_date=datetime.now(),
            horizon_months=horizon_months,
            total_demand_fte=total_demand,
            total_capacity_fte=total_capacity,
            utilization_pct=utilization,
            gaps=gaps,
            recommendations=recommendations
        )

    def generate_report(self) -> str:
        """Generate capacity planning report."""
        forecast = self.generate_forecast()

        lines = [
            "# Capacity Planning Report",
            "",
            f"**Organization:** {self.organization_name}",
            f"**Report Date:** {forecast.forecast_date.strftime('%Y-%m-%d')}",
            "",
            "## Executive Summary",
            "",
            f"| Metric | Value |",
            f"|--------|-------|",
            f"| Active Projects | {len(self.projects)} |",
            f"| Pipeline Opportunities | {len(self.pipeline)} |",
            f"| Total Staff | {len(self.staff)} |",
            f"| Current Capacity (FTE) | {forecast.total_capacity_fte:.1f} |",
            f"| Current Demand (FTE) | {forecast.total_demand_fte:.1f} |",
            f"| Utilization | {forecast.utilization_pct:.0f}% |",
            "",
            "## Capacity by Role",
            "",
            "| Role | Capacity | Demand | Gap |",
            "|------|----------|--------|-----|"
        ]

        capacity = self.get_current_capacity()
        demand = self.calculate_demand(datetime.now())

        for role in ResourceRole:
            cap = capacity.get(role, 0)
            dem = demand.get(role, 0)
            gap = cap - dem
            gap_icon = "✅" if gap >= 0 else "⚠️" if gap > -1 else "🔴"
            lines.append(
                f"| {role.value} | {cap:.1f} | {dem:.1f} | {gap:+.1f} {gap_icon} |"
            )

        # Active projects
        lines.extend([
            "",
            "## Active Projects",
            "",
            "| Project | Value | Phase | End Date |",
            "|---------|-------|-------|----------|"
        ])

        for p in sorted(self.projects.values(), key=lambda x: x.value, reverse=True):
            lines.append(
                f"| {p.project_name} | ${p.value:,.0f} | {p.phase.value} | "
                f"{p.end_date.strftime('%Y-%m-%d')} |"
            )

        # Pipeline
        if self.pipeline:
            lines.extend([
                "",
                "## Pipeline",
                "",
                "| Opportunity | Value | Probability | Expected Start |",
                "|-------------|-------|-------------|----------------|"
            ])

            for p in sorted(self.pipeline.values(), key=lambda x: -x.probability):
                lines.append(
                    f"| {p.project_name} | ${p.value:,.0f} | {p.probability:.0%} | "
                    f"{p.start_date.strftime('%Y-%m-%d')} |"
                )

        # Gaps
        critical_gaps = [g for g in forecast.gaps if g.severity == "critical"]
        if critical_gaps:
            lines.extend([
                "",
                f"## Critical Capacity Gaps ({len(critical_gaps)})",
                "",
                "| Role | Period | Gap |",
                "|------|--------|-----|"
            ])

            for gap in critical_gaps[:10]:
                lines.append(
                    f"| {gap.role.value} | {gap.period_start.strftime('%Y-%m')} | "
                    f"{gap.gap:.1f} FTE |"
                )

        # Recommendations
        if forecast.recommendations:
            lines.extend([
                "",
                "## Recommendations",
                ""
            ])
            for rec in forecast.recommendations:
                lines.append(f"- {rec}")

        return "\n".join(lines)
```

## Quick Start

```python
from datetime import datetime, timedelta

# Initialize planner
planner = CapacityPlanner("ABC Construction")

# Add staff
planner.add_staff("PM-001", "John Smith", ResourceRole.PROJECT_MANAGER)
planner.add_staff("PM-002", "Jane Doe", ResourceRole.PROJECT_MANAGER)
planner.add_staff("SUP-001", "Mike Johnson", ResourceRole.SUPERINTENDENT)
planner.add_staff("SUP-002", "Bob Williams", ResourceRole.SUPERINTENDENT)
planner.add_staff("SUP-003", "Tom Brown", ResourceRole.SUPERINTENDENT)
planner.add_staff("PE-001", "Sarah Davis", ResourceRole.PROJECT_ENGINEER)
planner.add_staff("PE-002", "Chris Wilson", ResourceRole.PROJECT_ENGINEER)

# Add active projects
planner.add_active_project(
    "PRJ-001", "Downtown Tower",
    value=25000000,
    phase=ProjectPhase.CONSTRUCTION,
    start_date=datetime(2024, 6, 1),
    end_date=datetime(2025, 12, 31)
)

planner.add_active_project(
    "PRJ-002", "Hospital Wing",
    value=40000000,
    phase=ProjectPhase.CONSTRUCTION,
    start_date=datetime(2024, 9, 1),
    end_date=datetime(2026, 6, 30)
)

# Add pipeline opportunities
planner.add_pipeline_opportunity(
    "OPP-001", "Office Complex",
    value=30000000,
    win_probability=0.6,
    expected_start=datetime(2025, 3, 1),
    duration_months=18
)

# Check if can pursue new project
evaluation = planner.can_pursue_project(
    value=20000000,
    start_date=datetime(2025, 6, 1),
    duration_months=12
)
print(f"Recommendation: {evaluation['recommendation']}")
for action in evaluation['actions_required']:
    print(f"  - {action}")

# Generate forecast
forecast = planner.generate_forecast()
print(f"Utilization: {forecast.utilization_pct:.0f}%")
print(f"Critical gaps: {len([g for g in forecast.gaps if g.severity == 'critical'])}")

# Generate report
print(planner.generate_report())
```

## Requirements

```bash
pip install (no external dependencies)
```

© datadrivenconstruction · MIT · datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction

Similar skills

All skills for Notes, tasks and projects →

From the same set156

The whole set →
clash-detection-analysis clash-detection-analysis detects geometric clashes between IFC BIM elements, identifying physical intersections and clearance violations before construction starts. CX Codex +1 115installs scenario-planner scenario-planner models construction scenarios and compares options by cost, schedule, and resources. Helps you see what happens if you double the crew or compress the timeline. CX Codex +1 115installs ontology-mapper ontology-mapper maps construction data elements to standard schemas like IFC, COBie, and Uniclass for cross-system semantic consistency. CX Codex +1 115installs json-parser json-parser is a skill that parses and checks JSON from construction APIs, IoT sensors, and BIM exports, turning nested records into tables for structured-data projects. CX Codex +1 115installs weather-api weather-api is a Claude Code skill that retrieves weather forecasts and historical data and assesses conditions for construction work. It supports scheduling outdoor tasks. CX Codex +1 115installs cwicr-location-factor cwicr-location-factor is a Claude Code skill that applies regional labor, material, and equipment factors to CWICR estimates. Compare project costs across regions. CX Codex +1 115installs email-construction email-construction generates structured construction emails: RFI responses, submittal transmittals, change order notices, and meeting invites. CX Codex +1 115installs kpi-dashboard kpi-dashboard is a Claude Code skill that builds KPI dashboards for construction projects. It tracks cost, schedule, quality, and safety metrics. CX Codex +1 1installs

Project sponsors

Companies that keep this analytics open