4d-simulation — Claude Code skill: BIM timeline and phasing
4d-simulation links building models to project schedules and visualizes construction sequences day by day. Detects scheduling conflicts and analyzes work phases.
MIT 125 installs ★ 434 updated 2026-10-19
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-codeWhat 4d-simulation does
The skill takes BIM elements—foundations, columns, slabs—and ties each to tasks in your schedule. Inside are Python classes for auto-linking by category or building level, then a simulation engine that shows the site state on any date: what has not started, what is under construction, what is done.
It generates Gantt charts and checks for sequencing errors: whether two elements are scheduled simultaneously when resources do not allow it, or if work order breaks logic. Requires Python 3 in PATH and BIM data as a table with element ID, category, level, start and end dates.
What it helps with
- visualize construction progress across time and building levels
- catch scheduling conflicts before work begins
- analyze phase duration and work sequence
- generate a Gantt chart linked to the BIM model
- reorder work to fit resource constraints
Example prompts for the agent
- Link model elements to the schedule and list all work active on January 15
- Find conflicts between parallel construction phases
- Build a 4D timeline for each month of the project
How to install 4d-simulation
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-code2Manually: put the files in place
~/.claude/skills/4d-simulation/SKILL.mdCopy the whole skill folder; for one project use .claude/skills/4d-simulation/
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a codex2Manually: put the files in place
.agents/skills/4d-simulation/SKILL.mdFor all projects use ~/.agents/skills/
1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a cursor2Manually: put the files in place
.cursor/skills/4d-simulation/SKILL.mdCursor also reads .agents/skills/ and .claude/skills/
1GitHub CLI
gh skill install datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction 2_DDC_Book/3.3-4D-BIM-CO2-Simulation/4d-simulation2Manually: put the files in place
.github/skills/4d-simulation/SKILL.md1Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a gemini-cli2Platform CLI
gemini skills install https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --path 2_DDC_Book/3.3-4D-BIM-CO2-Simulation/4d-simulationManually: put the files in place
.devin/skills/4d-simulation/SKILL.mdThe legacy .windsurf/skills/ path still works
Skills CLI (Vercel)
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a opencodeClaude.ai
Zip the folder and upload it in Settings → Capabilities → Skills
Step by step, with commands for each platform: How to install skills in Claude Code: five ways
Questions about 4d-simulation
How do I install 4d-simulation in Claude Code?
Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-code, then open ~/.claude/skills/4d-simulation/SKILL.md.
What does this skill do?
Ties BIM elements to dates in your project schedule and shows how the building goes up day by day. It flags scheduling conflicts and analyzes the order of work.
What do I need to use it?
Python 3 must be installed and in your PATH. You need BIM data—element ID, category, level, start and end dates—as a table or dataframe.
Source text
SKILL.md · MIT
---
name: "4d-simulation"
description: "Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🎬", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# 4D Simulation for Construction
## Overview
Based on DDC methodology (Chapter 3.3), this skill implements 4D BIM simulations - linking 3D model elements to the 4th dimension: time. Visualize construction sequences, detect scheduling conflicts, and optimize work phasing.
**Book Reference:** "4D, 6D-8D и расчет CO2" / "4D-8D BIM and CO2 Calculation"
> "4D моделирование позволяет визуализировать последовательность строительства и выявлять конфликты на этапе планирования."
> — DDC Book, Chapter 3.3
## Quick Start
```python
import pandas as pd
from datetime import datetime, timedelta
# BIM elements with schedule data
elements = pd.DataFrame({
'ElementId': ['E001', 'E002', 'E003', 'E004'],
'Category': ['Foundation', 'Column', 'Beam', 'Slab'],
'Level': ['Level 0', 'Level 1', 'Level 1', 'Level 1'],
'Start_Date': ['2024-01-01', '2024-01-15', '2024-02-01', '2024-02-15'],
'End_Date': ['2024-01-14', '2024-01-31', '2024-02-14', '2024-02-28'],
'Phase': ['Structure', 'Structure', 'Structure', 'Structure']
})
elements['Start_Date'] = pd.to_datetime(elements['Start_Date'])
elements['End_Date'] = pd.to_datetime(elements['End_Date'])
elements['Duration_Days'] = (elements['End_Date'] - elements['Start_Date']).dt.days
# Get elements active on a specific date
target_date = pd.to_datetime('2024-01-20')
active_elements = elements[
(elements['Start_Date'] <= target_date) &
(elements['End_Date'] >= target_date)
]
print(f"Elements under construction on {target_date.date()}:")
print(active_elements[['ElementId', 'Category']])
```
## 4D Data Model
### Schedule-Element Linking
```python
import pandas as pd
import numpy as np
from datetime import datetime, timedelta
from typing import List, Dict, Optional
class ScheduleElementLinker:
"""Link BIM elements to schedule activities"""
def __init__(self, elements_df: pd.DataFrame, schedule_df: pd.DataFrame):
self.elements = elements_df.copy()
self.schedule = schedule_df.copy()
self.links = pd.DataFrame()
def auto_link_by_category(self, mapping: Dict[str, str]):
"""Auto-link elements to activities by category mapping
Args:
mapping: Dict mapping element categories to activity names
e.g., {'Wall': 'Structural Walls', 'Slab': 'Floor Construction'}
"""
links = []
for category, activity_name in mapping.items():
# Find elements of this category
category_elements = self.elements[
self.elements['Category'] == category
]['ElementId'].tolist()
# Find matching activity
activity = self.schedule[
self.schedule['Activity'].str.contains(activity_name, case=False)
]
if not activity.empty and category_elements:
for elem_id in category_elements:
links.append({
'ElementId': elem_id,
'ActivityId': activity.iloc[0]['ActivityId'],
'Activity': activity.iloc[0]['Activity'],
'Start_Date': activity.iloc[0]['Start_Date'],
'End_Date': activity.iloc[0]['End_Date']
})
self.links = pd.DataFrame(links)
return self.links
def auto_link_by_level(self):
"""Auto-link elements based on level and construction sequence"""
# Get unique levels in order
levels = sorted(self.elements['Level'].unique())
links = []
for i, level in enumerate(levels):
level_elements = self.elements[self.elements['Level'] == level]
# Find activity for this level
level_activity = self.schedule[
self.schedule['Activity'].str.contains(level, case=False)
]
if not level_activity.empty:
for _, elem in level_elements.iterrows():
links.append({
'ElementId': elem['ElementId'],
'ActivityId': level_activity.iloc[0]['ActivityId'],
'Activity': level_activity.iloc[0]['Activity'],
'Start_Date': level_activity.iloc[0]['Start_Date'],
'End_Date': level_activity.iloc[0]['End_Date']
})
self.links = pd.DataFrame(links)
return self.links
def manual_link(self, element_id: str, activity_id: str):
"""Manually link element to activity"""
element = self.elements[self.elements['ElementId'] == element_id]
activity = self.schedule[self.schedule['ActivityId'] == activity_id]
if element.empty or activity.empty:
raise ValueError("Element or activity not found")
new_link = pd.DataFrame([{
'ElementId': element_id,
'ActivityId': activity_id,
'Activity': activity.iloc[0]['Activity'],
'Start_Date': activity.iloc[0]['Start_Date'],
'End_Date': activity.iloc[0]['End_Date']
}])
self.links = pd.concat([self.links, new_link], ignore_index=True)
return self.links
def get_linked_elements(self):
"""Get elements with schedule data"""
return self.elements.merge(
self.links[['ElementId', 'ActivityId', 'Start_Date', 'End_Date']],
on='ElementId',
how='left'
)
```
### 4D Simulation Engine
```python
class Simulation4D:
"""4D construction simulation engine"""
def __init__(self, linked_elements: pd.DataFrame):
self.elements = linked_elements.copy()
self.elements['Start_Date'] = pd.to_datetime(self.elements['Start_Date'])
self.elements['End_Date'] = pd.to_datetime(self.elements['End_Date'])
self.project_start = self.elements['Start_Date'].min()
self.project_end = self.elements['End_Date'].max()
def get_state_at_date(self, target_date: datetime) -> pd.DataFrame:
"""Get element states at a specific date"""
target = pd.to_datetime(target_date)
# Determine state for each element
conditions = [
target < self.elements['Start_Date'], # Not started
(self.elements['Start_Date'] <= target) & (target <= self.elements['End_Date']), # In progress
target > self.elements['End_Date'] # Completed
]
choices = ['not_started', 'in_progress', 'completed']
self.elements['State'] = np.select(conditions, choices, default='unknown')
return self.elements.copy()
def generate_timeline(self, interval_days: int = 7) -> List[Dict]:
"""Generate timeline snapshots"""
timeline = []
current_date = self.project_start
while current_date <= self.project_end:
state = self.get_state_at_date(current_date)
snapshot = {
'date': current_date,
'not_started': len(state[state['State'] == 'not_started']),
'in_progress': len(state[state['State'] == 'in_progress']),
'completed': len(state[state['State'] == 'completed']),
'total': len(state)
}
snapshot['progress_pct'] = (snapshot['completed'] / snapshot['total']) * 100
timeline.append(snapshot)
current_date += timedelta(days=interval_days)
return timeline
def get_elements_in_progress(self, target_date: datetime) -> pd.DataFrame:
"""Get elements currently under construction"""
state = self.get_state_at_date(target_date)
return state[state['State'] == 'in_progress']
def analyze_construction_sequence(self) -> pd.DataFrame:
"""Analyze construction sequence by category and level"""
sequence = self.elements.groupby(['Level', 'Category']).agg({
'Start_Date': 'min',
'End_Date': 'max',
'ElementId': 'count'
}).rename(columns={'ElementId': 'Element_Count'})
sequence['Duration_Days'] = (sequence['End_Date'] - sequence['Start_Date']).dt.days
sequence = sequence.sort_values('Start_Date').reset_index()
return sequence
def detect_parallel_work(self) -> pd.DataFrame:
"""Detect work happening in parallel"""
dates = pd.date_range(self.project_start, self.project_end, freq='D')
parallel_work = []
for date in dates:
state = self.get_state_at_date(date)
in_progress = state[state['State'] == 'in_progress']
if len(in_progress) > 1:
categories = in_progress['Category'].unique().tolist()
levels = in_progress['Level'].unique().tolist()
parallel_work.append({
'date': date,
'parallel_count': len(in_progress),
'categories': ', '.join(categories),
'levels': ', '.join(levels)
})
return pd.DataFrame(parallel_work)
```
## Gantt Chart Integration
### Gantt Chart Generator
```python
import matplotlib.pyplot as plt
import matplotlib.dates as mdates
from matplotlib.patches import Patch
class GanttChartGenerator:
"""Generate Gantt charts for 4D simulation"""
def __init__(self, elements: pd.DataFrame):
self.elements = elements.copy()
self.colors = {
'Foundation': '#8B4513',
'Column': '#4169E1',
'Beam': '#228B22',
'Slab': '#DC143C',
'Wall': '#FF8C00',
'Roof': '#9932CC',
'MEP': '#20B2AA',
'Finishes': '#FFD700'
}
def create_gantt(self, group_by='Category', figsize=(14, 8)):
"""Create Gantt chart grouped by specified column"""
fig, ax = plt.subplots(figsize=figsize)
# Group elements
groups = self.elements.groupby(group_by)
y_pos = 0
y_labels = []
legend_elements = []
for group_name, group_df in groups:
color = self.colors.get(group_name, '#808080')
for _, row in group_df.iterrows():
start = row['Start_Date']
duration = (row['End_Date'] - row['Start_Date']).days
ax.barh(y_pos, duration, left=start, height=0.6,
color=color, alpha=0.8, edgecolor='black', linewidth=0.5)
y_pos += 1
y_labels.append(group_name)
legend_elements.append(Patch(facecolor=color, label=group_name))
# Formatting
ax.set_yticks(range(len(self.elements)))
ax.set_yticklabels(self.elements['ElementId'])
ax.set_xlabel('Date')
ax.set_title('Construction Schedule - Gantt Chart', fontsize=14, fontweight='bold')
# Date formatting
ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
ax.xaxis.set_major_locator(mdates.WeekdayLocator(interval=2))
plt.xticks(rotation=45)
# Legend
ax.legend(handles=legend_elements, loc='upper right')
# Grid
ax.grid(axis='x', alpha=0.3)
plt.tight_layout()
return fig
def create_level_gantt(self, figsize=(14, 10)):
"""Create Gantt chart grouped by level"""
fig, ax = plt.subplots(figsize=figsize)
levels = sorted(self.elements['Level'].unique())
for i, level in enumerate(levels):
level_elements = self.elements[self.elements['Level'] == level]
for _, row in level_elements.iterrows():
color = self.colors.get(row['Category'], '#808080')
start = row['Start_Date']
duration = (row['End_Date'] - row['Start_Date']).days
ax.barh(i, duration, left=start, height=0.4,
color=color, alpha=0.8, edgecolor='black', linewidth=0.5)
ax.set_yticks(range(len(levels)))
ax.set_yticklabels(levels)
ax.set_xlabel('Date')
ax.set_ylabel('Building Level')
ax.set_title('Construction Sequence by Level', fontsize=14, fontweight='bold')
ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
plt.xticks(rotation=45)
# Add legend
legend_patches = [Patch(color=c, label=cat) for cat, c in self.colors.items()
if cat in self.elements['Category'].values]
ax.legend(handles=legend_patches, loc='upper right')
plt.tight_layout()
return fig
def create_progress_chart(self, timeline: List[Dict], figsize=(12, 6)):
"""Create S-curve progress chart"""
df = pd.DataFrame(timeline)
fig, ax = plt.subplots(figsize=figsize)
ax.plot(df['date'], df['progress_pct'], 'b-', linewidth=2, label='Progress')
ax.fill_between(df['date'], 0, df['progress_pct'], alpha=0.3)
# Add milestones at 25%, 50%, 75%, 100%
for milestone in [25, 50, 75, 100]:
ax.axhline(y=milestone, color='gray', linestyle='--', alpha=0.5)
ax.text(df['date'].iloc[0], milestone + 2, f'{milestone}%',
fontsize=9, color='gray')
ax.set_xlabel('Date')
ax.set_ylabel('Progress (%)')
ax.set_title('Project S-Curve', fontsize=14, fontweight='bold')
ax.set_ylim(0, 105)
ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
plt.xticks(rotation=45)
plt.tight_layout()
return fig
```
## Sequence Analysis
### Construction Sequence Optimizer
```python
class SequenceAnalyzer:
"""Analyze and optimize construction sequences"""
def __init__(self, elements: pd.DataFrame):
self.elements = elements.copy()
self.dependencies = []
def add_dependency(self, predecessor: str, successor: str, lag_days: int = 0):
"""Add dependency between elements"""
self.dependencies.append({
'predecessor': predecessor,
'successor': successor,
'lag_days': lag_days
})
def check_sequence_violations(self) -> List[Dict]:
"""Check for sequence violations"""
violations = []
for dep in self.dependencies:
pred = self.elements[self.elements['ElementId'] == dep['predecessor']]
succ = self.elements[self.elements['ElementId'] == dep['successor']]
if pred.empty or succ.empty:
continue
pred_end = pred.iloc[0]['End_Date']
succ_start = succ.iloc[0]['Start_Date']
required_start = pred_end + timedelta(days=dep['lag_days'])
if succ_start < required_start:
violations.append({
'predecessor': dep['predecessor'],
'successor': dep['successor'],
'predecessor_end': pred_end,
'successor_start': succ_start,
'required_start': required_start,
'violation_days': (required_start - succ_start).days
})
return violations
def check_spatial_conflicts(self) -> List[Dict]:
"""Check for spatial conflicts (same location, same time)"""
conflicts = []
# Group by location (Level + Zone if available)
location_col = 'Level'
for location, group in self.elements.groupby(location_col):
if len(group) < 2:
continue
# Check for overlapping work
for i, row1 in group.iterrows():
for j, row2 in group.iterrows():
if i >= j:
continue
# Check date overlap
overlap = (row1['Start_Date'] <= row2['End_Date'] and
row2['Start_Date'] <= row1['End_Date'])
if overlap:
conflicts.append({
'location': location,
'element1': row1['ElementId'],
'element1_category': row1['Category'],
'element2': row2['ElementId'],
'element2_category': row2['Category'],
'overlap_start': max(row1['Start_Date'], row2['Start_Date']),
'overlap_end': min(row1['End_Date'], row2['End_Date'])
})
return conflicts
def calculate_critical_path(self) -> List[str]:
"""Calculate critical path (simplified)"""
# Build dependency graph
graph = {}
for elem in self.elements['ElementId']:
graph[elem] = {
'predecessors': [],
'duration': 0
}
for dep in self.dependencies:
if dep['successor'] in graph:
graph[dep['successor']]['predecessors'].append(dep['predecessor'])
# Calculate durations
for _, row in self.elements.iterrows():
if row['ElementId'] in graph:
graph[row['ElementId']]['duration'] = (row['End_Date'] - row['Start_Date']).days
# Find longest path (simplified critical path)
def longest_path(node, memo={}):
if node in memo:
return memo[node]
if not graph[node]['predecessors']:
return graph[node]['duration']
max_pred = max(
longest_path(pred, memo) for pred in graph[node]['predecessors']
)
memo[node] = max_pred + graph[node]['duration']
return memo[node]
# Get all path lengths
path_lengths = {elem: longest_path(elem) for elem in graph.keys()}
# Critical path elements
max_length = max(path_lengths.values())
critical = [elem for elem, length in path_lengths.items() if length == max_length]
return critical
```
## Export and Integration
```python
def export_4d_schedule(elements: pd.DataFrame, output_path: str):
"""Export 4D schedule to Excel with multiple views"""
with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
# Full schedule
elements.to_excel(writer, sheet_name='Schedule', index=False)
# By level
level_summary = elements.groupby('Level').agg({
'ElementId': 'count',
'Start_Date': 'min',
'End_Date': 'max'
}).rename(columns={'ElementId': 'Element_Count'})
level_summary['Duration_Days'] = (level_summary['End_Date'] - level_summary['Start_Date']).dt.days
level_summary.to_excel(writer, sheet_name='By_Level')
# By category
cat_summary = elements.groupby('Category').agg({
'ElementId': 'count',
'Start_Date': 'min',
'End_Date': 'max'
}).rename(columns={'ElementId': 'Element_Count'})
cat_summary.to_excel(writer, sheet_name='By_Category')
return output_path
```
## Quick Reference
| Concept | Description |
|---------|-------------|
| 4D = 3D + Time | BIM model linked to schedule |
| Activity | Scheduled work item |
| Element State | not_started / in_progress / completed |
| Critical Path | Longest sequence determining project duration |
## Resources
- **Book**: "Data-Driven Construction" by Artem Boiko, Chapter 3.3
- **Website**: https://datadrivenconstruction.io
## Next Steps
- See `gantt-chart` for schedule visualization
- See `co2-estimation` for 6D (sustainability) analysis
- See `clash-detection-analysis` for 4D conflict detection