4d-simulation — Claude Code skill: BIM timeline and phasing

4d-simulation links building models to project schedules and visualizes construction sequences day by day. Detects scheduling conflicts and analyzes work phases.

MIT 125 installs ★ 434 updated 2026-10-19

Install into Claude Code · Skills CLI (Vercel) All methods and platforms ↓
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-code
Open on GitHub

What 4d-simulation does

The skill takes BIM elements—foundations, columns, slabs—and ties each to tasks in your schedule. Inside are Python classes for auto-linking by category or building level, then a simulation engine that shows the site state on any date: what has not started, what is under construction, what is done.

It generates Gantt charts and checks for sequencing errors: whether two elements are scheduled simultaneously when resources do not allow it, or if work order breaks logic. Requires Python 3 in PATH and BIM data as a table with element ID, category, level, start and end dates.

What it helps with

  • visualize construction progress across time and building levels
  • catch scheduling conflicts before work begins
  • analyze phase duration and work sequence
  • generate a Gantt chart linked to the BIM model
  • reorder work to fit resource constraints

Example prompts for the agent

  • Link model elements to the schedule and list all work active on January 15
  • Find conflicts between parallel construction phases
  • Build a 4D timeline for each month of the project

How to install 4d-simulation

1Skills CLI (Vercel)

npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-code

2Manually: put the files in place

~/.claude/skills/4d-simulation/SKILL.md

Copy the whole skill folder; for one project use .claude/skills/4d-simulation/

Step by step, with commands for each platform: How to install skills in Claude Code: five ways

Questions about 4d-simulation

How do I install 4d-simulation in Claude Code?

Run npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill 4d-simulation -a claude-code, then open ~/.claude/skills/4d-simulation/SKILL.md.

What does this skill do?

Ties BIM elements to dates in your project schedule and shows how the building goes up day by day. It flags scheduling conflicts and analyzes the order of work.

What do I need to use it?

Python 3 must be installed and in your PATH. You need BIM data—element ID, category, level, start and end dates—as a table or dataframe.

Source text

SKILL.md · MIT
---
name: "4d-simulation"
description: "Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "🎬", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# 4D Simulation for Construction

## Overview

Based on DDC methodology (Chapter 3.3), this skill implements 4D BIM simulations - linking 3D model elements to the 4th dimension: time. Visualize construction sequences, detect scheduling conflicts, and optimize work phasing.

**Book Reference:** "4D, 6D-8D и расчет CO2" / "4D-8D BIM and CO2 Calculation"

> "4D моделирование позволяет визуализировать последовательность строительства и выявлять конфликты на этапе планирования."
> — DDC Book, Chapter 3.3

## Quick Start

```python
import pandas as pd
from datetime import datetime, timedelta

# BIM elements with schedule data
elements = pd.DataFrame({
    'ElementId': ['E001', 'E002', 'E003', 'E004'],
    'Category': ['Foundation', 'Column', 'Beam', 'Slab'],
    'Level': ['Level 0', 'Level 1', 'Level 1', 'Level 1'],
    'Start_Date': ['2024-01-01', '2024-01-15', '2024-02-01', '2024-02-15'],
    'End_Date': ['2024-01-14', '2024-01-31', '2024-02-14', '2024-02-28'],
    'Phase': ['Structure', 'Structure', 'Structure', 'Structure']
})

elements['Start_Date'] = pd.to_datetime(elements['Start_Date'])
elements['End_Date'] = pd.to_datetime(elements['End_Date'])
elements['Duration_Days'] = (elements['End_Date'] - elements['Start_Date']).dt.days

# Get elements active on a specific date
target_date = pd.to_datetime('2024-01-20')
active_elements = elements[
    (elements['Start_Date'] <= target_date) &
    (elements['End_Date'] >= target_date)
]
print(f"Elements under construction on {target_date.date()}:")
print(active_elements[['ElementId', 'Category']])
```

## 4D Data Model

### Schedule-Element Linking

```python
import pandas as pd
import numpy as np
from datetime import datetime, timedelta
from typing import List, Dict, Optional

class ScheduleElementLinker:
    """Link BIM elements to schedule activities"""

    def __init__(self, elements_df: pd.DataFrame, schedule_df: pd.DataFrame):
        self.elements = elements_df.copy()
        self.schedule = schedule_df.copy()
        self.links = pd.DataFrame()

    def auto_link_by_category(self, mapping: Dict[str, str]):
        """Auto-link elements to activities by category mapping

        Args:
            mapping: Dict mapping element categories to activity names
                     e.g., {'Wall': 'Structural Walls', 'Slab': 'Floor Construction'}
        """
        links = []

        for category, activity_name in mapping.items():
            # Find elements of this category
            category_elements = self.elements[
                self.elements['Category'] == category
            ]['ElementId'].tolist()

            # Find matching activity
            activity = self.schedule[
                self.schedule['Activity'].str.contains(activity_name, case=False)
            ]

            if not activity.empty and category_elements:
                for elem_id in category_elements:
                    links.append({
                        'ElementId': elem_id,
                        'ActivityId': activity.iloc[0]['ActivityId'],
                        'Activity': activity.iloc[0]['Activity'],
                        'Start_Date': activity.iloc[0]['Start_Date'],
                        'End_Date': activity.iloc[0]['End_Date']
                    })

        self.links = pd.DataFrame(links)
        return self.links

    def auto_link_by_level(self):
        """Auto-link elements based on level and construction sequence"""
        # Get unique levels in order
        levels = sorted(self.elements['Level'].unique())

        links = []
        for i, level in enumerate(levels):
            level_elements = self.elements[self.elements['Level'] == level]

            # Find activity for this level
            level_activity = self.schedule[
                self.schedule['Activity'].str.contains(level, case=False)
            ]

            if not level_activity.empty:
                for _, elem in level_elements.iterrows():
                    links.append({
                        'ElementId': elem['ElementId'],
                        'ActivityId': level_activity.iloc[0]['ActivityId'],
                        'Activity': level_activity.iloc[0]['Activity'],
                        'Start_Date': level_activity.iloc[0]['Start_Date'],
                        'End_Date': level_activity.iloc[0]['End_Date']
                    })

        self.links = pd.DataFrame(links)
        return self.links

    def manual_link(self, element_id: str, activity_id: str):
        """Manually link element to activity"""
        element = self.elements[self.elements['ElementId'] == element_id]
        activity = self.schedule[self.schedule['ActivityId'] == activity_id]

        if element.empty or activity.empty:
            raise ValueError("Element or activity not found")

        new_link = pd.DataFrame([{
            'ElementId': element_id,
            'ActivityId': activity_id,
            'Activity': activity.iloc[0]['Activity'],
            'Start_Date': activity.iloc[0]['Start_Date'],
            'End_Date': activity.iloc[0]['End_Date']
        }])

        self.links = pd.concat([self.links, new_link], ignore_index=True)
        return self.links

    def get_linked_elements(self):
        """Get elements with schedule data"""
        return self.elements.merge(
            self.links[['ElementId', 'ActivityId', 'Start_Date', 'End_Date']],
            on='ElementId',
            how='left'
        )
```

### 4D Simulation Engine

```python
class Simulation4D:
    """4D construction simulation engine"""

    def __init__(self, linked_elements: pd.DataFrame):
        self.elements = linked_elements.copy()
        self.elements['Start_Date'] = pd.to_datetime(self.elements['Start_Date'])
        self.elements['End_Date'] = pd.to_datetime(self.elements['End_Date'])

        self.project_start = self.elements['Start_Date'].min()
        self.project_end = self.elements['End_Date'].max()

    def get_state_at_date(self, target_date: datetime) -> pd.DataFrame:
        """Get element states at a specific date"""
        target = pd.to_datetime(target_date)

        # Determine state for each element
        conditions = [
            target < self.elements['Start_Date'],  # Not started
            (self.elements['Start_Date'] <= target) & (target <= self.elements['End_Date']),  # In progress
            target > self.elements['End_Date']  # Completed
        ]
        choices = ['not_started', 'in_progress', 'completed']

        self.elements['State'] = np.select(conditions, choices, default='unknown')

        return self.elements.copy()

    def generate_timeline(self, interval_days: int = 7) -> List[Dict]:
        """Generate timeline snapshots"""
        timeline = []
        current_date = self.project_start

        while current_date <= self.project_end:
            state = self.get_state_at_date(current_date)

            snapshot = {
                'date': current_date,
                'not_started': len(state[state['State'] == 'not_started']),
                'in_progress': len(state[state['State'] == 'in_progress']),
                'completed': len(state[state['State'] == 'completed']),
                'total': len(state)
            }
            snapshot['progress_pct'] = (snapshot['completed'] / snapshot['total']) * 100

            timeline.append(snapshot)
            current_date += timedelta(days=interval_days)

        return timeline

    def get_elements_in_progress(self, target_date: datetime) -> pd.DataFrame:
        """Get elements currently under construction"""
        state = self.get_state_at_date(target_date)
        return state[state['State'] == 'in_progress']

    def analyze_construction_sequence(self) -> pd.DataFrame:
        """Analyze construction sequence by category and level"""
        sequence = self.elements.groupby(['Level', 'Category']).agg({
            'Start_Date': 'min',
            'End_Date': 'max',
            'ElementId': 'count'
        }).rename(columns={'ElementId': 'Element_Count'})

        sequence['Duration_Days'] = (sequence['End_Date'] - sequence['Start_Date']).dt.days
        sequence = sequence.sort_values('Start_Date').reset_index()

        return sequence

    def detect_parallel_work(self) -> pd.DataFrame:
        """Detect work happening in parallel"""
        dates = pd.date_range(self.project_start, self.project_end, freq='D')
        parallel_work = []

        for date in dates:
            state = self.get_state_at_date(date)
            in_progress = state[state['State'] == 'in_progress']

            if len(in_progress) > 1:
                categories = in_progress['Category'].unique().tolist()
                levels = in_progress['Level'].unique().tolist()

                parallel_work.append({
                    'date': date,
                    'parallel_count': len(in_progress),
                    'categories': ', '.join(categories),
                    'levels': ', '.join(levels)
                })

        return pd.DataFrame(parallel_work)
```

## Gantt Chart Integration

### Gantt Chart Generator

```python
import matplotlib.pyplot as plt
import matplotlib.dates as mdates
from matplotlib.patches import Patch

class GanttChartGenerator:
    """Generate Gantt charts for 4D simulation"""

    def __init__(self, elements: pd.DataFrame):
        self.elements = elements.copy()
        self.colors = {
            'Foundation': '#8B4513',
            'Column': '#4169E1',
            'Beam': '#228B22',
            'Slab': '#DC143C',
            'Wall': '#FF8C00',
            'Roof': '#9932CC',
            'MEP': '#20B2AA',
            'Finishes': '#FFD700'
        }

    def create_gantt(self, group_by='Category', figsize=(14, 8)):
        """Create Gantt chart grouped by specified column"""
        fig, ax = plt.subplots(figsize=figsize)

        # Group elements
        groups = self.elements.groupby(group_by)

        y_pos = 0
        y_labels = []
        legend_elements = []

        for group_name, group_df in groups:
            color = self.colors.get(group_name, '#808080')

            for _, row in group_df.iterrows():
                start = row['Start_Date']
                duration = (row['End_Date'] - row['Start_Date']).days

                ax.barh(y_pos, duration, left=start, height=0.6,
                       color=color, alpha=0.8, edgecolor='black', linewidth=0.5)

                y_pos += 1

            y_labels.append(group_name)
            legend_elements.append(Patch(facecolor=color, label=group_name))

        # Formatting
        ax.set_yticks(range(len(self.elements)))
        ax.set_yticklabels(self.elements['ElementId'])
        ax.set_xlabel('Date')
        ax.set_title('Construction Schedule - Gantt Chart', fontsize=14, fontweight='bold')

        # Date formatting
        ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
        ax.xaxis.set_major_locator(mdates.WeekdayLocator(interval=2))
        plt.xticks(rotation=45)

        # Legend
        ax.legend(handles=legend_elements, loc='upper right')

        # Grid
        ax.grid(axis='x', alpha=0.3)

        plt.tight_layout()
        return fig

    def create_level_gantt(self, figsize=(14, 10)):
        """Create Gantt chart grouped by level"""
        fig, ax = plt.subplots(figsize=figsize)

        levels = sorted(self.elements['Level'].unique())

        for i, level in enumerate(levels):
            level_elements = self.elements[self.elements['Level'] == level]

            for _, row in level_elements.iterrows():
                color = self.colors.get(row['Category'], '#808080')
                start = row['Start_Date']
                duration = (row['End_Date'] - row['Start_Date']).days

                ax.barh(i, duration, left=start, height=0.4,
                       color=color, alpha=0.8, edgecolor='black', linewidth=0.5)

        ax.set_yticks(range(len(levels)))
        ax.set_yticklabels(levels)
        ax.set_xlabel('Date')
        ax.set_ylabel('Building Level')
        ax.set_title('Construction Sequence by Level', fontsize=14, fontweight='bold')

        ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
        plt.xticks(rotation=45)

        # Add legend
        legend_patches = [Patch(color=c, label=cat) for cat, c in self.colors.items()
                         if cat in self.elements['Category'].values]
        ax.legend(handles=legend_patches, loc='upper right')

        plt.tight_layout()
        return fig

    def create_progress_chart(self, timeline: List[Dict], figsize=(12, 6)):
        """Create S-curve progress chart"""
        df = pd.DataFrame(timeline)

        fig, ax = plt.subplots(figsize=figsize)

        ax.plot(df['date'], df['progress_pct'], 'b-', linewidth=2, label='Progress')
        ax.fill_between(df['date'], 0, df['progress_pct'], alpha=0.3)

        # Add milestones at 25%, 50%, 75%, 100%
        for milestone in [25, 50, 75, 100]:
            ax.axhline(y=milestone, color='gray', linestyle='--', alpha=0.5)
            ax.text(df['date'].iloc[0], milestone + 2, f'{milestone}%',
                   fontsize=9, color='gray')

        ax.set_xlabel('Date')
        ax.set_ylabel('Progress (%)')
        ax.set_title('Project S-Curve', fontsize=14, fontweight='bold')
        ax.set_ylim(0, 105)

        ax.xaxis.set_major_formatter(mdates.DateFormatter('%Y-%m-%d'))
        plt.xticks(rotation=45)

        plt.tight_layout()
        return fig
```

## Sequence Analysis

### Construction Sequence Optimizer

```python
class SequenceAnalyzer:
    """Analyze and optimize construction sequences"""

    def __init__(self, elements: pd.DataFrame):
        self.elements = elements.copy()
        self.dependencies = []

    def add_dependency(self, predecessor: str, successor: str, lag_days: int = 0):
        """Add dependency between elements"""
        self.dependencies.append({
            'predecessor': predecessor,
            'successor': successor,
            'lag_days': lag_days
        })

    def check_sequence_violations(self) -> List[Dict]:
        """Check for sequence violations"""
        violations = []

        for dep in self.dependencies:
            pred = self.elements[self.elements['ElementId'] == dep['predecessor']]
            succ = self.elements[self.elements['ElementId'] == dep['successor']]

            if pred.empty or succ.empty:
                continue

            pred_end = pred.iloc[0]['End_Date']
            succ_start = succ.iloc[0]['Start_Date']

            required_start = pred_end + timedelta(days=dep['lag_days'])

            if succ_start < required_start:
                violations.append({
                    'predecessor': dep['predecessor'],
                    'successor': dep['successor'],
                    'predecessor_end': pred_end,
                    'successor_start': succ_start,
                    'required_start': required_start,
                    'violation_days': (required_start - succ_start).days
                })

        return violations

    def check_spatial_conflicts(self) -> List[Dict]:
        """Check for spatial conflicts (same location, same time)"""
        conflicts = []

        # Group by location (Level + Zone if available)
        location_col = 'Level'

        for location, group in self.elements.groupby(location_col):
            if len(group) < 2:
                continue

            # Check for overlapping work
            for i, row1 in group.iterrows():
                for j, row2 in group.iterrows():
                    if i >= j:
                        continue

                    # Check date overlap
                    overlap = (row1['Start_Date'] <= row2['End_Date'] and
                              row2['Start_Date'] <= row1['End_Date'])

                    if overlap:
                        conflicts.append({
                            'location': location,
                            'element1': row1['ElementId'],
                            'element1_category': row1['Category'],
                            'element2': row2['ElementId'],
                            'element2_category': row2['Category'],
                            'overlap_start': max(row1['Start_Date'], row2['Start_Date']),
                            'overlap_end': min(row1['End_Date'], row2['End_Date'])
                        })

        return conflicts

    def calculate_critical_path(self) -> List[str]:
        """Calculate critical path (simplified)"""
        # Build dependency graph
        graph = {}
        for elem in self.elements['ElementId']:
            graph[elem] = {
                'predecessors': [],
                'duration': 0
            }

        for dep in self.dependencies:
            if dep['successor'] in graph:
                graph[dep['successor']]['predecessors'].append(dep['predecessor'])

        # Calculate durations
        for _, row in self.elements.iterrows():
            if row['ElementId'] in graph:
                graph[row['ElementId']]['duration'] = (row['End_Date'] - row['Start_Date']).days

        # Find longest path (simplified critical path)
        def longest_path(node, memo={}):
            if node in memo:
                return memo[node]

            if not graph[node]['predecessors']:
                return graph[node]['duration']

            max_pred = max(
                longest_path(pred, memo) for pred in graph[node]['predecessors']
            )
            memo[node] = max_pred + graph[node]['duration']
            return memo[node]

        # Get all path lengths
        path_lengths = {elem: longest_path(elem) for elem in graph.keys()}

        # Critical path elements
        max_length = max(path_lengths.values())
        critical = [elem for elem, length in path_lengths.items() if length == max_length]

        return critical
```

## Export and Integration

```python
def export_4d_schedule(elements: pd.DataFrame, output_path: str):
    """Export 4D schedule to Excel with multiple views"""
    with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
        # Full schedule
        elements.to_excel(writer, sheet_name='Schedule', index=False)

        # By level
        level_summary = elements.groupby('Level').agg({
            'ElementId': 'count',
            'Start_Date': 'min',
            'End_Date': 'max'
        }).rename(columns={'ElementId': 'Element_Count'})
        level_summary['Duration_Days'] = (level_summary['End_Date'] - level_summary['Start_Date']).dt.days
        level_summary.to_excel(writer, sheet_name='By_Level')

        # By category
        cat_summary = elements.groupby('Category').agg({
            'ElementId': 'count',
            'Start_Date': 'min',
            'End_Date': 'max'
        }).rename(columns={'ElementId': 'Element_Count'})
        cat_summary.to_excel(writer, sheet_name='By_Category')

    return output_path
```

## Quick Reference

| Concept | Description |
|---------|-------------|
| 4D = 3D + Time | BIM model linked to schedule |
| Activity | Scheduled work item |
| Element State | not_started / in_progress / completed |
| Critical Path | Longest sequence determining project duration |

## Resources

- **Book**: "Data-Driven Construction" by Artem Boiko, Chapter 3.3
- **Website**: https://datadrivenconstruction.io

## Next Steps

- See `gantt-chart` for schedule visualization
- See `co2-estimation` for 6D (sustainability) analysis
- See `clash-detection-analysis` for 4D conflict detection

© datadrivenconstruction · MIT · datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction

Similar skills

All skills for AI and ML →

From the same set156

The whole set →
pdf-construction pdf-construction extracts data from RFI forms, splits drawing sets by sheet, parses CSI specifications, and builds submittal packages from construction PDFs. CX Codex +1 126installs punch-list-manager punch-list-manager is a Claude Code skill that tracks construction deficiencies from site walks through final acceptance, including assignments, deadlines, photos, and verification. CX Codex +1 125installs llm-document-extraction The llm-document-extraction skill parses unstructured PDFs—RFIs, submittals, contracts, specifications—into structured JSON and Excel. Uses LLMs to analyze text, classify document types, and extract fields automatically. CX Codex +1 125installs quality-control-workflow The quality-control-workflow skill structures construction quality control from inspection planning to defect resolution, with records for findings, NCRs, and specification checks. CX Codex +1 125installs image-to-data The image-to-data skill analyzes construction site photos, scanned documents, and drawings, extracting text, tables, and detected objects using computer vision and OCR. CX Codex +1 125installs xml-reader xml-reader — a skill for Claude Code, Cursor, Codex and other platforms that reads XML from P6, IFC, COBie and buildingSMART Data Dictionary. Converts elements to pandas DataFrames. CX Codex +1 125installs cwicr-quantity-matcher cwicr-quantity-matcher matches BIM element quantities with CWICR work items using categories and descriptions. Useful for linking quantity takeoffs to cost codes and flagging uncertain matches. CX Codex +1 125installs as-built-documentation as-built-documentation automates construction as-built records and digital handover packages. It tracks equipment warranties, checks document completeness, and organizes asset data for facility operations. CX Codex +1 124installs

Project sponsors

Companies that keep this analytics open