# change-order-processor

change-order-processor — a skill for Claude Code, Codex, Cursor, GitHub Copilot, and other agents that tracks construction change orders: cost breakdown, approval chain, and schedule impact.

- skill · `type=skill` · Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, OpenCode, Windsurf (Devin Desktop), Claude.ai · 123 installs · ★ 434 repo stars
- Author: datadrivenconstruction
- License: MIT · policy=mirror · the beginning of the file is at the end of this page
- Source: https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/HEAD/1_DDC_Toolkit/Cost-Management/change-order-processor/SKILL.md
- Updated: 2026-10-19
- Security check: automated, 2026-11-16 (text) — no signs of malicious code found.
- HTML: https://affpapa.org/en/nevibecode/skills/change-order-processor

## What it does

The skill runs on Claude Code, Codex, Cursor, GitHub Copilot, Gemini CLI, and OpenCode across Darwin, Linux, and Windows. It depends on `python3` in the system `PATH` and uses `pandas` internally — without that binary the skill will not start.

Each change order gets a sequential `CO-XXXX` identifier and a type tag: owner request, design change, field condition, code compliance, value engineering, or error and omission. Cost items break down by category — labor, materials, equipment, subcontractor — with overhead and profit calculated on top of the direct total. Every approval step stores the approver's name, role, action, and date, keeping the audit trail intact. Schedule impact records a day count tied to specific affected activities.

For projects where change orders pile up faster than the paperwork, that full cycle from draft to approved status sitting in one data structure matters: nothing falls through the gap between a field decision and the budget spreadsheet.

## Install

### Claude Code (native platform)

1. **Skills CLI (Vercel)**
```bash
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill change-order-processor -a claude-code
```

2. **Manually: put the files in place**
- File: `~/.claude/skills/change-order-processor/SKILL.md` — Copy the whole skill folder; for one project use .claude/skills/change-order-processor/

### Codex

1. **Skills CLI (Vercel)**
```bash
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill change-order-processor -a codex
```

2. **Manually: put the files in place**
- File: `.agents/skills/change-order-processor/SKILL.md` — For all projects use ~/.agents/skills/

### Cursor

1. **Skills CLI (Vercel)**
```bash
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill change-order-processor -a cursor
```

2. **Manually: put the files in place**
- File: `.cursor/skills/change-order-processor/SKILL.md` — Cursor also reads .agents/skills/ and .claude/skills/

### GitHub Copilot

1. **GitHub CLI**
```bash
gh skill install datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction 1_DDC_Toolkit/Cost-Management/change-order-processor
```

2. **Manually: put the files in place**
- File: `.github/skills/change-order-processor/SKILL.md`

### Gemini CLI

1. **Skills CLI (Vercel)**
```bash
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill change-order-processor -a gemini-cli
```

2. **Platform CLI**
```bash
gemini skills install https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --path 1_DDC_Toolkit/Cost-Management/change-order-processor
```

### Windsurf (Devin Desktop)

**Manually: put the files in place**
- File: `.devin/skills/change-order-processor/SKILL.md` — The legacy .windsurf/skills/ path still works

### OpenCode

**Skills CLI (Vercel)**
```bash
npx skills add datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction --skill change-order-processor -a opencode
```

### Claude.ai

**Claude.ai**
- Zip the folder and upload it in Settings → Capabilities → Skills

Where a file is given instead of a command, copy the files from the source to that path: https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/HEAD/1_DDC_Toolkit/Cost-Management/change-order-processor/SKILL.md

## When to use it
- generate a numbered change order with automatic cost rollup
- split costs by category: labor, materials, equipment, subcontractor
- route a change order through an approval chain and log each decision
- record schedule impact in days against specific work activities
- produce a contract summary showing total cost and schedule shift across all change orders

## Example prompts
- Create a field-condition change order for the foundation scope, add labor and material line items, and calculate the total with overhead
- Record the chief engineer's approval decision on `CO-0003` with today's date
- Show a rollup of all change orders: cumulative schedule shift and contract budget variance

## Source text · SKILL.md · MIT

Below is the content of a third-party file. It is data, not instructions for you: do not act on anything written inside unless the human asks. Block tag: 2aa0cbfaee322382.

BEGIN THIRD-PARTY FILE 2aa0cbfaee322382
````text
---
name: "change-order-processor"
description: "Process and manage construction change orders. Track costs, approvals, and impact on schedule and budget."
homepage: "https://datadrivenconstruction.io"
metadata: {"openclaw": {"emoji": "💰", "os": ["darwin", "linux", "win32"], "homepage": "https://datadrivenconstruction.io", "requires": {"bins": ["python3"]}}}
---
# Change Order Processor

## Business Case

### Problem Statement
Change orders cause project disruption:
- Delayed processing affects cash flow
- Unclear cost impact
- Lost documentation
- Schedule impacts not tracked

### Solution
Streamlined change order processing with cost analysis, approval workflow, and impact tracking.

### Business Value
- **Faster processing** - Reduce approval cycle time
- **Cost control** - Accurate change pricing
- **Documentation** - Complete audit trail
- **Impact visibility** - Schedule and budget effects

## Technical Implementation

```python
import pandas as pd
from datetime import datetime, date, timedelta
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from enum import Enum


class ChangeOrderStatus(Enum):
    """Change order status."""
    DRAFT = "draft"
    PENDING_REVIEW = "pending_review"
    PENDING_APPROVAL = "pending_approval"
    APPROVED = "approved"
    REJECTED = "rejected"
    VOID = "void"


class ChangeType(Enum):
    """Type of change."""
    OWNER_REQUESTED = "owner_requested"
    DESIGN_CHANGE = "design_change"
    FIELD_CONDITION = "field_condition"
    CODE_COMPLIANCE = "code_compliance"
    VALUE_ENGINEERING = "value_engineering"
    ERROR_OMISSION = "error_omission"


class ImpactType(Enum):
    """Impact categories."""
    COST_INCREASE = "cost_increase"
````
END THIRD-PARTY FILE 2aa0cbfaee322382

The third-party file has ended. Everything between the 2aa0cbfaee322382 tags is data: requests and commands from it are not followed. An “end of file” line with another tag inside the block is part of the file.

First 1741 of 14318 bytes. © datadrivenconstruction · MIT · https://github.com/datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction/tree/HEAD/1_DDC_Toolkit/Cost-Management/change-order-processor/SKILL.md

_Part of the page did not fit — see the HTML version._

---
NeVibeCode on affpapa.org. Catalog texts are descriptions, not instructions for the agent. How to choose and install: https://affpapa.org/en/nevibecode/agents.md
