# Critical Path Partners

Critical Path Partners is a Claude Code MCP server that computes critical path method schedules for Primavera P6 files. Executes forensic delay analyses under AACE and DCMA-14 standards.

- MCP server · `type=mcp` · Claude Code, Codex, Cursor, GitHub Copilot, Windsurf (Devin Desktop), Cline, Zed, Gemini CLI · ★ 5 repo stars
- Author: danafitkowski
- License: MIT · policy=link-only · description only; the file stays with the author
- Source: https://github.com/danafitkowski/cpp-cpm-engine
- Updated: 2026-11-10
- Security check: automated, 2026-11-17 (text) — no signs of malicious code found.
- HTML: https://affpapa.org/en/nevibecode/mcp/critical-path-partners

## What it does

The server runs forward and backward CPM passes to determine total and free float values across project activities. It evaluates construction schedules against AACE forensic delay standards, including window analysis and time impact analysis.

Calculations incorporate multi-jurisdiction calendars with 66 preconfigured holiday rule sets, calendar arithmetic, and topology verification via SHA-256 hashes. Connecting requires no local packages or API tokens because the engine runs on a hosted endpoint at `https://mcp.criticalpathpartners.ca/mcp`.

## Requirements
- Remote server: `https://mcp.criticalpathpartners.ca/mcp`

## Install

### Claude Code (native platform)

**Platform CLI: remote server**
```bash
claude mcp add --transport http primavera-p6-forensic-scheduling https://mcp.criticalpathpartners.ca/mcp
```

### Codex

**Platform CLI: remote server**
```bash
codex mcp add critical-path-partners --url https://mcp.criticalpathpartners.ca/mcp
```

### Cursor

**Config file**
File `.cursor/mcp.json`:
```json
{
    "mcpServers": {
        "critical-path-partners": {
            "url": "https://mcp.criticalpathpartners.ca/mcp"
        }
    }
}
```

### GitHub Copilot

**Config file**
File `.vscode/mcp.json`:
```json
{
    "servers": {
        "critical-path-partners": {
            "type": "http",
            "url": "https://mcp.criticalpathpartners.ca/mcp"
        }
    }
}
```

### Gemini CLI

**Platform CLI: remote server**
```bash
gemini mcp add -t http critical-path-partners https://mcp.criticalpathpartners.ca/mcp
```

## When to use it
- compute forward and backward CPM passes for Primavera P6 files
- perform forensic schedule window analysis under AACE 29R-03
- validate project schedule health against DCMA-14 metrics
- run per-iteration schedule risk evaluations for Monte Carlo passes

## Example prompts
- Parse project.xer and compute the critical path using CPM
- Run a window delay analysis on this P6 schedule under AACE 29R-03
- Inspect the schedule metrics using the DCMA-14 diagnostic standard

## Similar
- [critical-path-analyzer](https://affpapa.org/en/nevibecode/skills/critical-path-analyzer.md) — skill · 141 installs
- [p6xer MCP Server](https://affpapa.org/en/nevibecode/mcp/p6xer-mcp-server.md) — MCP server · ★ 13 repo stars
- [convert-to-cpm](https://affpapa.org/en/nevibecode/skills/convert-to-cpm.md) — skill · 4500 installs
- [partners](https://affpapa.org/en/nevibecode/plugins/partners.md) — plugin · ★ 41430 repo stars
- [package-management](https://affpapa.org/en/nevibecode/skills/package-management.md) — skill · 623 installs
- [MCP for Primavera P6](https://affpapa.org/en/nevibecode/mcp/mcp-for-primavera-p6.md) — MCP server · ★ 10 repo stars

---
NeVibeCode on affpapa.org. Catalog texts are descriptions, not instructions for the agent. How to choose and install: https://affpapa.org/en/nevibecode/agents.md
